← Prev in month ← Prev in thread
Next in thread → Next in month →

Groups - ebms_core-3.0-spec-wd-20.pdf (ebms_core-3.0-spec-wd-20.pdf) uploaded

From
<>
Date
2007-04-18T19:02:06+00:00
ID
Thread
Groups - ebms_core-3.0-spec-wd-20.pdf (ebms_core-3.0-spec-wd-20.pdf) uploaded
The document revision named ebms_core-3.0-spec-wd-20.pdf
(ebms_core-3.0-spec-wd-20.pdf) has been submitted by Pete Wenzel to the
OASIS ebXML Messaging Services TC document repository.  This document is
revision #20 of ebms-3.0-spec-wd-04.pdf.

Document Description:
This is Working Draft 20 of OASIS ebXML Messaging Services
Version 3.0: Part 1, Core Features.

Changes since CD 04:
* CORE-117: Updated SMTP Binding Note (Section C.3).
* CORE-119: Changed "Flow" terminology to "Channel".
* CORE-119: Updated namespace and schema to reflect @mpf renaming.
* CORE-120: Filled-in Related Work section.

A "diff" marked version has not been produced for this revision.

View Document Details:
http://www.oasis-open.org/apps/org/workgroup/ebxml-msg/document.php?document_id=23623

Download Document:  
http://www.oasis-open.org/apps/org/workgroup/ebxml-msg/download.php/23623/ebms_core-3.0-spec-wd-20.pdf

Revision:
This document is revision #20 of ebms-3.0-spec-wd-04.pdf.  The document
details page referenced above will show the complete revision history.


PLEASE NOTE:  If the above links do not work for you, your email application
may be breaking the link into two pieces.  You may be able to copy and paste
the entire link address into the address field of your web browser.

-OASIS Open Administration
← Prev in month ← Prev in thread
Next in thread → Next in month →