← Prev in month ← Prev in thread
Next in thread → Next in month →

Groups - EDXL-TEP Practitioner open issues (TEP-Stakeholder-IssuesRev2.5_Feb2011.xls) uploaded

From
<>
Date
2011-04-07T14:44:05+00:00
ID
Thread
Groups - EDXL-TEP Practitioner open issues (TEP-Stakeholder-IssuesRev2.5_Feb2011.xls) uploaded
Disposition of this list was updated for close issues or those previously
incorporated into the OASIS submission package, and added requirements
uncovered from planning cycles of the May 2011 5-state draft TEP Proof of
Concept exercise.
Tim

 -- Tim Grapes

The document revision named EDXL-TEP Practitioner open issues
(TEP-Stakeholder-IssuesRev2.5_Feb2011.xls) has been submitted by Tim Grapes
to the EM TEP SC document repository.  This document is revision #1 of
TEP-Stakeholder-IssuesRev2.3_06-10-2010(1).xls.

Document Description:
TEP requirements and draft messageing specification review cycle comments
and issues which were deferred to the OASIS process for resolution

View Document Details:
http://www.oasis-open.org/committees/document.php?document_id=41756

Download Document:  
http://www.oasis-open.org/committees/download.php/41756/TEP-Stakeholder-IssuesRev2.5_Feb2011.xls

Revision:
This document is revision #1 of
TEP-Stakeholder-IssuesRev2.3_06-10-2010(1).xls.  The document details page
referenced above will show the complete revision history.


PLEASE NOTE:  If the above links do not work for you, your email application
may be breaking the link into two pieces.  You may be able to copy and paste
the entire link address into the address field of your web browser.

-OASIS Open Administration
← Prev in month ← Prev in thread
Next in thread → Next in month →