My initial reaction as well, but NYISO does compensate them at energy prices, though response is completely voluntary.  They're sort of in the "hail Mary" end of the resource spectrum.
Phil Davis | Senior Manager - Solutions | Schneider Electric Demand Response Resource Center | 3103 Medlock Bridge Road, Suite 100 | Norcross, GA  30071 | 404..567.6090 |  | www.schneider-electric.com 

On Wed, Sep 15, 2010 at 10:36 AM, Crimmins, Sean <> wrote:

I think not.  By definition these are outside the market.

----- Original Message -----

From: Phil Davis [mailto:]

Sent: Wednesday, September 15, 2010 07:26 AM

To: Crimmins, Sean;  <>; 'Edward G. Cazalet' <>;  <>

Subject: RE: [emix] Ramp intervals

Would we be concerned in this group for transactions associated with

non-economic bids, i.e., emergency calls?

Phil

-----Original Message-----

From: Crimmins, Sean [mailto:]

Sent: Wednesday, September 15, 2010 7:39 AM

To: ; 'Edward G. Cazalet'; 

Subject: RE: [emix] Ramp intervals

The ramp rate curve is a characteristic of the unit that determines whether

it will be selected and what the five minute dispatches will look like once

the unit is online (e.g when ramping from 100 MW to 200 MW).  It is not

strictly part of the three part bid which is purely economic; $/MW, Startup

cost and Minimum load cost.  While the nominal ramp rate curve is determined

by physical unit characteristics it is possible to submit reduced ramp rate

curves that are lower than the units capablity to reduce wear and tear or

other "economic" reasons.

________________________________________

From: Toby Considine [] on behalf of Toby Considine

[]

Sent: Wednesday, September 15, 2010 2:25 AM

To: 'Edward G. Cazalet'; 

Subject: RE: [emix] Ramp intervals

So, if I understand this, ISO markets just set delta T small enough in the

ramp periods that they do not care.

The other proposal would be that in EMIX, we defined a generic enumeration

object which has two variations: Simple (a number) or ramp (begin rate, end

rate)

Another indication might be a "variance allowed", such that if your [ramp]

variation is greater than this, you must divide the intervals.

tc

________________________________

"If something is not worth doing, it`s not worth doing well" - Peter Drucker

________________________________ Toby Considine TC9, Inc TC Chair: oBIX &

WS-Calendar TC Editor: EMIX, EnergyInterop U.S. National Inst. of Standards

and Tech. Smart Grid Architecture Committee

Email: <mailto:>

Phone: (919)619-2104

http://www.tcnine.com/

blog: www.NewDaedalus.com

From: Edward G. Cazalet [mailto:]

Sent: Tuesday, September 14, 2010 6:01 PM

To: ; 

Subject: RE: [emix] Ramp intervals

I know there is another thread from this email related to DR "ramps", but

this note is focused on generation although much of it applies to DR and

loads as well.

I disagree that each EMIX product needs a ramp component.  Some EMIX product

may have a ramp component.

A good example is bidding into ISO markets.  The ISO accepts multi-part bids

from generators and dispatches them, Part of the bid is a ramp rate curve

vs. MW output (not a WS-calendar construct ).  The output of the ISO process

is hourly and five minute schedules for the generator, without any explicit

WS-Calendar-like ramp.  Yes the generator does not move instantly from the

level in one interval to the next in a step, but the balancing processes of

the ISO accommodate this.

Most forward wholesale contracts may be scheduled hourly.  Ramping up and

down from levels in one hour to next often has an assumed ramp ( from 10

minutes before the hour to 10  minutes after the hour). As Phil has said, a

registration process can deal with any standard ramp assumptions.  For

financial contracts the ramp can be ignored.

In automated markets it is easier to deal with schedules where the ramp is a

characterized by series of shorter interval schedules.  It is also how we

meter delivery as energy over an interval.  This provides standard products

and contracts in each interval.  If every offer has a different ramp rate on

each end markets it is harder to get liquid markets.

Also, think of the complexity in adding up a large portfolio of schedules

each with a different embedded WS_Calendar ramp rate.  The final schedule

with include all of the ramps, all with different durations and start times.

It is much easier to do what we do today which is a sequence of yearly,

monthly, daily, hourly, 5 min schedules each of which are simple block

schedules, transactions, or offers.

Edward G. Cazalet, Ph.D.

101 First Street, Suite 552

Los Altos, CA 94022

650-949-5274

cell: 408-621-2772

<mailto:>

www.cazalet.com<http://www.cazalet.com>

From: Toby Considine [mailto:] On Behalf Of Toby

Considine

Sent: Tuesday, September 14, 2010 12:20 PM

To: 

Subject: [emix] Ramp intervals

Do we need a construction within EMIX for ramping intervals? I am tieing

this to such things as the 3-part generation bids Consider the case of a

long generation cycle followed by a discrete ramp cycle. The whole shape is

the electricity produced. Things don't just shut down, there is some

electricity that needs to go somewhere, and if it goes onto the grid, it

must be planned for and balanced.

The large rectangle on the left is the scheduled generation period. The it

may be scheduled for three hours, it may be scheduled for 1, it may be

scheduled for 16. The slopey bit on the right  just comes along for the

ride.

[cid:[email protected]]

The shape above is an ugly interval.We could solve it by making an infinite

number of intervals, or at least enough so that we can assume that each one

was flat. I think it would be an error to recreate intro calculus within

EMIX. [cid:[email protected]]

WS-Calendar supports separating a scenario like that above, in which the

things are split into two linked intervals. It is easy to schedule the

interval on the left, to any length, It is the supply of a constant amount

of energy for a variable period of time, as per contract. The funny looking

shape on the right, comes along for the ride; buying the left is buying the

right. This occurs in many scnarios in homes / buildings / energy / . So in

Emix, we have a product, and then we have a ramp. The ramp is a predictable

varying, but constant duration (probably) delivery of product. There may be

ramp ups and ramp downs.

We need to include handling of ramped energy in each EMX product.

________________________________

"It is difficult to get a man to understand something, when his salary

depends upon his not understanding it" -- Upton Sinclair.

________________________________

Toby Considine

TC9, Inc

OASIS Technical Advisory Board

TC Chair: oBIX & WS-Calendar

TC Editor: EMIX, EnergyInterop

U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee

Email: <mailto:>

Phone: (919)619-2104

http://www.tcnine.com/

blog: www.NewDaedalus.com<http://www.NewDaedalus.com>

****************************************************************************

*****************

The foregoing electronic message, together with any attachments thereto, is

confidential and may be legally privileged against disclosure other than to

the intended recipient. It is intended solely for the addressee(s) and

access to the message by anyone else is unauthorized. If you are not the

intended recipient of this electronic message, you are hereby notified that

any dissemination, distribution, or any action taken or omitted to be taken

in reliance on it is strictly prohibited and may be unlawful. If you have

received this electronic message in error, please delete and immediately

notify the sender of this error.

****************************************************************************

*****************

---------------------------------------------------------------------

To unsubscribe from this mail list, you must leave the OASIS TC that

generates this mail.  Follow this link to all your TCs in OASIS at:

https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php

________________________________________________________________________

This email has been scanned for SPAM content and Viruses by the MessageLabs

Email Security System.

________________________________________________________________________

---------------------------------------------------------------------

To unsubscribe from this mail list, you must leave the OASIS TC that

generates this mail.  Follow this link to all your TCs in OASIS at:

https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php

*********************************************************************************************

The foregoing electronic message, together with any attachments thereto, is confidential and may be legally privileged against disclosure other than to the intended recipient. It is intended solely for the addressee(s) and access to the message by anyone else is unauthorized. If you are not the intended recipient of this electronic message, you are hereby notified that any dissemination, distribution, or any action taken or omitted to be taken in reliance on it is strictly prohibited and may be unlawful. If you have received this electronic message in error, please delete and immediately notify the sender of this error.

*********************************************************************************************