Toby,

 

Congrats on the WS-Calendar progress.  

 

I was looking forward to hearing your explanation
of WS-Calendar at the meeting Thursday, but unfortunately I have a conflicting
meeting scheduled by a client.

 

Also. 
I have a separate note on the product structure idea that I posted earlier
that I will also send before the meeting.

 

With respect to inheritance I do not think it
should be for only price and quantity. 
Rather, he designer of a product should be able  to make any attribute of a product such
as price, strike price, option premium, quantity, loss factor,  max generator capacity etc. either be a
constant over the scheduled sequence or partitions.

 

Perhaps we need a notation to specify which
and how a an attribute of a product may vary by interval or partitions or
sequences of intervals.

 

Ed

 

Edward G. Cazalet, Ph.D.

101 First Street, Suite 552

Los Altos, CA 94022

650-949-5274

cell: 408-621-2772



www.cazalet.com

 

From: Toby Considine [mailto:] On
Behalf Of Toby Considine

Sent: Wednesday, September 22, 2010 7:04 PM

To: 

Subject: [emix] Late Breaking Changes

 

I’m not going to send you a new EMIX tonight

 

I have been trying to tighten up some confusing references
(while thinking in my mind “Who wrote this!?”) to WS-Calendar

 

If we have time, we can discuss:

 

Section 2.4, in which the use of WS-Calendar is
introduced:

 

Time and Schedules as part of EMIX

Time is an important component of
energy product transactions. A product produced in one interval of time may
have to be stored or may not be able to be stored for a later interval of time.
Thus the same product in different intervals of time may have difference prices.
EMIX uses WS-Calendar to to apply prices and products to time intervals. 

WS-Calendar defines a mechanism to apply a schedule to a
sequence of time intervals. WS-Calendar further defines how to use inheritance
to apply a single information model to each interval in the sequence, allowing
elements of that information model to be over ridden within any given interval.
WS-Calendar. WS-Calendar also defines a schedule entry point, defining how
specific performance can be contracted and scheduled. 

This document assumes that the reader has a clear
understanding of WS-Calendar and its interfaces. The non-normative appendices
of the WS-Calendar specification are a good place to start.

 

 

Section 4.1, in which inheritance is mentioned

 

Attribute Inheritance in EMIX

EMIX uses WS-Calendar to associate a Product with a Sequence
of Intervals. The EMIX Product acts as a Calendar Gluon. If needed, Calendar
Gluons / Products can be recursive, enabling attribute inheritance through a
chain of Calendar Gluons. In EMIX, this pattern defines how an external
contract can establish price and intervals atop an invariant EMIX object.

For a fuller discussion, see [WS-Calendar]

 

Question:
Should we distinguish between an Interval that has a Price, an Interval that
has a Quantity, and one that has Both? The first two are types of offers, the
last is a contract or records the sale.

 

 

We need some wider discussion of Inheritance

 

Also, I have moved the discourse on electrical variables
to Appendix B.

 

tc

“It is difficult to get a man to understand something,
when his salary depends upon his not understanding it” -- Upton Sinclair. 

 

  
  
Toby Considine

  TC9, Inc

  
OASIS Technical Advisory Board

  TC Chair: oBIX & WS-Calendar

  
TC Editor: EMIX, EnergyInterop

  
U.S. National Inst. of Standards and Tech.
  Smart Grid Architecture Committee

  
  
  
  

  
  
  
Email: 

  Phone: (919)619-2104

  
http://www.tcnine.com/

  blog: www.NewDaedalus.com