Groups - emix-1-0-schemas-wd23-corrections.zip uploaded

From
Toby Considine
Date
2011-04-26T21:06:00+00:00
ID
Thread
Groups - emix-1-0-schemas-wd23-corrections.zip uploaded
That is correct. Only those two schemas, with the diffs, are changed.

 As for the motion to the TC-Admin, it is my sense that they prefer to receive a single package, rather than direction to replace one, keep the next, replace a third, etc.

 "It is the theory that decides what can be observed."
- Albert Einstein

 Toby Considine
 Chair, OASIS oBIX Technical Committee
 U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee
 Facilities Technology Office
 University of North Carolina
 Chapel Hill, NC
Email: Toby.Considine@ unc.edu
Phone: (919)962-9073
  http://www.oasis-open.org
 blog: www.NewDaedalus.com