← Prev in month ← Prev in thread
Next in thread → Next in month →

Comments on emix-v1.0-csprd02

From
Sharon Dinges
Date
2011-05-20T14:45:00+00:00
ID
Thread
Comments on emix-v1.0-csprd02
Great job to the primary authors – this is a great specification.  Here are my suggested changes:

259:  Suggest changing to: “… by
one  Party to another Party”

372: Suggest changing to: “… can
be  offered…”

453: change “therefor” to “therefore”

454: change “has is” to “is” – for Minimum Recovery Duration and Minimum Duration Between Invocations

454: (throughout document, actually) – adhere to consistent use of the period (.) punctuation mark in tables, bullets, etc.

454: Why do Availability Schedule and Unavailability Schedule have identical definitions – I would expect a slight difference

473: suggest changing to: “… meter,
an  aggregation…”

479: suggest changing to: “… Purchase Order,
on  each…”

489: existing wording not clear: “… not include quantity or
precise .”

492: suggest changing from “This illustration” to “Figure 6-1” (since it is on the following page)

507, 512: Change comma to a period

510: add space to: “Table  4-1describe ”

513: Product Description: change “nor” to “not”

515: suggest changing to: “… Sequence
as  a temporally…”

519: existing wording not clear for Relation: “… one Interval to  other …”

531: change to: “Electrical energy
and
must…”

537: existing wording not clear: “… could
be brought market …”

548: add colon after “that”

549a: revise to be consistent with 762: “energy = power * duration”

551: change “with in” to “within”

575: Price Relative: change wording to: “… and
of
a…”

590: Price – change from “… choice one of a Price…” to “… choice of either Price…”

590, 599: Energy Units – revise description to read: “Denominates the units to which the Price applies.”

599: Block Energy Price: revise wording to read: “… Quantify and  the  price for
the  next…”

603 616: (and throughout), standardizes on “TeMIX” rather than “TEMIX”

603: remove extra period at end of sentence

608: change “intervals” to “interval”

612, 790: (throughout)

Energy Item equation – why is this “Time” rather than duration, as in 549?  Make consistent throughout, if appropriate

623, 624: Revise to read: “One charge can be applied to each of the products as above  , so is defined here  .  That charge is the Demand Charge , as defined below: ”

625: Measurement Interval: change to “Granularity
of  Power Use…”

625: What is the right term: “floor”, Demand Charge Floor”, “Demand Floor” – it is used in three different ways in this table… make consistent

633: Full Requirements Power: “Demand Charges” is an incomplete thought…

633: Full Requirements Power Maximum and Minimum: existing wording not clear: “… draw energy at least the minimum rate”

633: Hourly Day Ahead Pricing: change to “Full Requirements Power”

634: add period to end of sentence

676, 683: (and elsewhere in document): standardize on the use of either “min” or “minutes” but, do not mix the units

678: change to: “… as above,
to
capabilities…”

683: change from “100MW” to “100 MW”

703: Constraints – change from “below” to “in Table 10-2”

710: Staging Ramp and Recovery Ramp: change to “An array
of  Power…”
736: change to something like: “… many markets,
they
Offer Curves…”

787: clean up the “Error!” reference

792: Strike Price: - where is “Option Writer” defined?

792: Granularity – change from “at10:00” to “at 10:00”

820: Power Frequency – change from “Powr Quality” to “Power Quality”

834: Transport Loss Factor – modify parantheses to match Conversion Loss Factor: “Loss Factor * purchase amount = delivered amount).  Also, throughout the document, be consistent in what is on the left side of each equation, and what is  on the right side – both methods are used.

867: change “Conformance” to “conformance”, unless there is a deliberate reason for the capitalization

875: add period to end of sentence
Regards,
 - Sharon
Sharon E. Dinges, CEM
System Applications Engineer; Smart Grid Standards Initiatives Lead
l  Desk: 651.407.4244  l  mobile:763.954.0469

l  Trane – Ingersoll Rand Climate Solutions  l  4833 White Bear Pkwy, St.
Paul, MN 55110

The information contained in this message is privileged and intended only for the recipients named. If the reader is not a representative of the intended recipient, any review, dissemination or copying of this message or the information it contains is prohibited.  If you have received this message in error, please immediately notify the sender, and delete the original message and attachments.
← Prev in month ← Prev in thread
Next in thread → Next in month →