← Prev in month
← Prev in thread
Next in thread →
Next in month →
[OASIS Issue Tracker] Created: (EMIX-534) Correction to example line 867
Correction to example line 867
------------------------------
Key: EMIX-534
URL: http://tools.oasis-open.org/issues/browse/EMIX-534
Project: OASIS Energy Market Information Exchange (eMIX) TC
Issue Type: Bug
Environment: PR04 Allen Jones
Reporter: William Cox
Assignee: William Cox
The following comment relates to the difference tracked version of the EMIX draft standard (http://docs.oasis-open.org/emix/emix/v1.0/csprd04/emix-v1.0-csprd04-diff.pdf).
In the previous version of the standard, lines 867 - 870 read "An example is the sale of 1 MW tomorrow between 3 and 5 PM that may be measured every 15 minutes (The energy is 1 MWh). The power in each 15 minute Interval is 1 MW and the Energy in each 15 minute Interval is 0.25 MWh."
In the latest version of the standard, lines 867 - 870 were changed to "An example is the sale of 1 MW tomorrow between 3 and 5 PM that may be measured every 15 minutes (The energy is 1 MWh). The power in each 15 minute Interval is 2 MW and the Energy in each 15 minute Interval is 0.25 MWh."
I believe that the wrong "1" was changed and that the sentences should actually read "An example is the sale of 1 MW tomorrow between 3 and 5 PM that may be measured every 15 minutes (The energy is 2 MWh). The power in each 15 minute Interval is 1 MW and the Energy in each 15 minute Interval is 0.25 MWh."
Thank you,
Allen Jones
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://tools.oasis-open.org/issues/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
← Prev in month
← Prev in thread
Next in thread →
Next in month →