Next in thread → Next in month →

Re: [energyinterop] Changes between PR and CD as submittedq

From
[ary [cQae
Date
2010-11-29T14:22:11+00:00
ID
Thread
Re: [energyinterop] Changes between PR and CD as submittedq
Hi Toby,

  Secretaries aren't listed on the cover page. You could always add something special to the acknowledgements section if the TC thought it appropriate. The spec doesn't include such notes. Hopefully people will pass around the notice rather than the document since it contains all of the instructions for commenting.

Best regards,

Mary

On Nov 29, 2010, at 6:14 AM, Considine, Toby (Campus Services IT) wrote:

Well, I just checked to make sure I uploaded the right stuff…

 

The Word and the PDF in

CSD URI

http://www.oasis-open.org/apps/org/workgroup/energyinterop/download.php/40425/energyinterop-1-0-spec-cd-01.zip

 

Each include a listing for the Secretary…

 

Page 4, after the Notices is “Notes for Reviewers”. The TC voted that the Public Review draft  must include internal comments to direct reviewers, to get wider input. It was also noted that the document was likely to be passed around, and not just forwarded as per the cover letter announcing its availability.

 

tc

 

"It is the theory that decides what can be observed."   - Albert Einstein

Toby Considine

Chair, OASIS oBIX Technical Committee
U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee

Facilities Technology Office
University of North Carolina
Chapel Hill, NC

  

Email: Toby.Considine@ unc.edu
Phone: (919)962-9073

http://www.oasis-open.org

blog: www.NewDaedalus.com

 

 

From: Mary McRae [mailto:] 
Sent: Sunday, November 28, 2010 10:54 PM
To: 
Cc: 
Subject: Re: [energyinterop] Changes between PR and CD as submittedq

 

Hmmm ... didn't touch any acknowledgements, and the 'note to reviewers' was included in the notice rather than the spec itself?

 

Mary 

 

On Nov 28, 2010, at 7:24 AM, Toby Considine wrote:

The Committee Draft as submitted is different in several ways from the Public Review as released. The OASIS staff performed their quality control and removed some non-standard acknowledgements as well as the “Note to Reviewers” page. The note to reviewers included the highlights that the committee requested.

 

<sigh />

 

tc

 

“It is difficult to get a man to understand something, when his salary depends upon his not understanding it” -- Upton Sinclair.

Toby Considine
TC9, Inc

OASIS Technical Advisory Board
TC Chair: oBIX & WS-Calendar

TC Editor: EMIX, EnergyInterop

U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee

  

Email: 
Phone: (919)619-2104

http://www.tcnine.com/
blog: www.NewDaedalus.com

 

 

 

<CD01 Note.pdf>
Next in thread → Next in month →