← Prev in month
← Prev in thread
Next in thread →
Next in month →
eContracts TC requirements draft 0.05
Dear TC members, Attached is a zip file with draft 0.05 of our requirements. This is the draft we will discuss during the phone conference on 10 May. There are 3 files in the zip package: * a PDF file with revision marks for changes to the previous draft; * a clean PDF file; and * an RTF file of the clean copy. The changes are mainly those discussed at the last phone conference and proposed by Daniel Greenwood. I have not taken in Dan's changes exactly. They are represented in sections 6.3.4 and 7.6. Dan, please let me know if you don't think I have represented your points fully. I made a few other minor adjustments in the spirit of existing material. Regards Peter Meyer ------------------------------------------------------------------------- Elkera Pty Limited (ACN 092 447 428) Email: Ph: +61 2 8440 6900 * Fax: +61 2 8440 6988 http://www.elkera.com.au
← Prev in month
← Prev in thread
Next in thread →
Next in month →