- I think it looks fine. We are all going to have to find the time to
provide input into the survey.
I am
curious about the subject line "Contractor Costing".
Ross
-----Original Message-----
From: Skyberg, David
[mailto:]
Sent: Monday, November 01, 2004
9:51 AM
To: PKI Lower Costs
Subject: [pki-lowercosts]
Contractor costing
Hi
folks,
We really need to close on this
issue soon. At our current rate, I don’t see us doing much of anything
for the remainder of the year. We really need to pick up the pace!
Here is the list of tasks that we have outlined. Let’s please all take a
moment and flesh these out so that we have what we believe to be a complete
set of tasks. If you don’t have any input for this, then please signal
your acceptance by emailing as such to the group.
Draft the
survey
Work with the sub committee
members to draft a survey. The sub committee will approve the survey
before the survey is conducted.
-
Survey Phase
1
TC members will be the target of
the first phase. The contractor will conduct the survey with all willing
TC members.
-
Phase 1
analysis
The contractor will provide
analysis of the survey results and coordinate feedback from the TC on the
survey itself.
-
Refine the
Survey
The contractor will edit and
refine the survey based on the feedback from the TC, the analysis of the phase
1 results, and guidance from the sub committee.
-
Identify second phase
targets
The contractor will coordinate
input from the TC as to likely candidates for the second phase survey.
The subcommittee will approve the final list.
-
Survey Phase
2
The contractor will conduct the
survey with representative on both the consumer and producer side of the PKI
industry.
-
Report analysis of
results
The contractor will report
analysis of the results to the sub committee in a format suitable for
reporting to both the TC as well as the public