← Prev in month ← Prev in thread
Next in thread → Next in month →

V2.0 document suite and proposed schedule

From
Philpott, Robert <>
Date
2004-06-09T13:37:15+00:00
ID
Thread
V2.0 document suite and proposed schedule
Re: the set of docs: 

 

Eve posted this diagram to the list last month:

http://www.oasis-open.org/archives/security-services/200405/msg00031.html

 

The doc’s that we need to have reviewed and stable
prior to our TC last call vote are:

-         
Core

-         
Bindings

-         
Profiles

-         
Conformance

-         
Security and Privacy Considerations

-         
Glossary

-         
Metadata

-         
Authn Context

-         
4 schemas: assertion, protocol,
metadata, authn context

 

In addition, we also should get our outreach documents
completed.  

-         
Executive Overview

-         
Technical Overview

-         
Implementation Guidelines

-         
Migration from SAML 1.1 and Liberty ID-FF 1.2

I don’t believe we originally planned for these to be
voted on as Committee Draft documents.  However, we did vote the 1.1
Technical Overview document as a Committee Draft, so perhaps we will want to do
the same for some of these. Let’s discuss it at the f2f.

 

Given the number and size of the documents, approaching
summer schedules, etc., neither Prateek nor I believe it is reasonable to vote
at the f2f to start our TC last call public review. We do intend to vote at the
f2f to move to a weekly official (quorum) con-call meeting schedule starting in
July so that we can keep this on track.

 

We are proposing the following schedule.  We believe
this to be reasonably aggressive, but with everyone’s commitment to get
the reviews done and documents updated, it is achievable.

 

 
June 15: V2.0 F2F in Toronto

 
June 22: Review updates since
     f2f.

 
June 29: Both Prateek and I
     will be out – anyone want a focus call this week?

 
July 6: All specification suite
     documents must have incorporated all input from the list and F2F #5. Note
     that this gives us 3 weeks since the F2F to complete all document changes
     and to resolve issues and action items.  This now begins sort of a
     pre-last-call deadline for final input.  Depending on how well things
     come together, we might possibly start our TC last call here, but we opted
     to allow another week before doing that.

 
July 13: VOTE to start 2-week committee
     last call period (includes external public review).

 
July 20: Review any last call
     input to date.

 
July 27: Cut-off date for TC
     last call input. All outstanding issues have been dealt with according to
     the last call process. The specs now become our "candidate”
     Committee Drafts and the TC addresses any outstanding non-normative
     editorial issues

 
August 3: VOTE to move
     spec’s to “Committee Draft” status (requires YES votes
     from 2/3 of ALL voting members). VOTE to move CD spec’s into 30-day
     Public Review for OASIS standardization (majority vote). Edit doc’s
     for CD status. Notify TC admin of the start of formal Public Review.

 
September 7 (first call
     following 30-day public review): Make sure all public review comments have
     been properly dispatched. Final editorial changes must be complete. VOTE
     to re-approve spec’s as final Committee Draft and VOTE to submit to
     OASIS for standardization.  

 
September 8-15: Complete all
     submission paperwork. All submissions for an October voting period must be
     complete by September 15.

 

Let us know what you think!

Rob Philpott

Senior Consulting Engineer 

RSA Security Inc. 

Tel: 781-515-7115 

Mobile: 617-510-0893 

Fax: 781-515-7020 

mailto:
← Prev in month ← Prev in thread
Next in thread → Next in month →