Hi all,
some items to be considered:
- check if all used examples are consistent with
the specification
- minor point: check that examples use english
names and are not potentially offensive
(Not everyone knows that "Sex Pistols" is a
punk band ;-)
- check all elements if they require some of the
new elements as children (e.g. I found out that
<when-true>, <when-false> and
<by-default> should have <variable> as child)
- Construct 4.0 DTD from the fragments of the
spec
- Even better, construct schema (The
<alias>-Element is a nice example where the DTD is not
sufficient)
- Create Metamodel from schema/DTD as Jean did with
the 3.1-Version
- Add the newly introduced Elements to section
3
- Check if some other terms have to be defined in
section 1.4 such as "Layout"
- Provide (Informative) References for other specs
and languages e.g. CTT etc.
I have found several small points for
improvement/corrections in the document. How should we proceed?
Should all the TC-members edit with "track changes"
on in parallel and James tries to update the input
he gets or should we
pass the document as a token sequentially?
Best regards,
Robbie.
--
_/ Dipl. Inf. Robbie Schaefer _/ Phone: +49 5251
60-6107 _/
_/ Visual Interactive Systems _/ Fax: +49 5251
60-6065 _/
_/ C-LAB Fuerstenallee
11
_/
_/
_/ D-33102 Paderborn
_/ URL: http://www.c-lab.de _/
----- Original Message -----
From:
James Helms
To:
Sent: Thursday, February 22, 2007 3:47
PM
Subject: [uiml] Schedule of items to be
completed before voting on the Committee Specification
Hello
all,
I have begun to
assemble the list of items that we need to finish before the
draft specification will be ready for consideration as a committee
draft. As I was putting this together I realized my individual view is
probably not sufficient and that I very much would like your input
on what still needs to be done.
Please take the
next week to review the specification draft I posted to the list last week and
send me any items that you believe should be added/edited before the committee
takes the specification to a vote. I will compile everyone's inputs into
a schedule to complete the document. Please send me your inputs by
the end of the day on Wednesday, February 28, 2007 and I will post the
schedule by March 3, 2007.