← Prev in month ← Prev in thread
Next in thread → Next in month →

Meeting minutes 2018-11-26

From
Uwe Ryssel
Date
2018-11-28T10:32:00+00:00
ID
Thread
Meeting minutes 2018-11-26
Dear VEL TC members,  attached you find the meeting minutes of the TC meeting held on Monday.  Best regards, Uwe Ryssel

--
Dr.-Ing. Uwe Ryssel
Phone: +49-391-54456939

Fax: +49-391-54456990 -- pure-systems GmbH GeschÃftsfÃhrung: Danilo Beuche, Holger Papajewski Sitz der Gesellschaft: Magdeburg Registergericht: Amtsgericht Stendal, HRB 113044
Meeting Minutes - Regular Call
Date: 26.11.2018 Time: 16:00 CET - 17:10 CET  Participants (TC Members):  Attendant:  Ryssel, Dr. Uwe, pure-systems Schulze, Dr. Michael, pure-systems Côrte-Real, Dr. Joana, Siemens AG Nesic, Mr. Damir, Swedish Royal Institute of Technology Malfreyt, Mr. Gilles, Thales Mattern, Mr. Stefan, Intel Corporation  Non-attendant:  Ensign, Mr. Chet, OASIS Schur, Mrs. Dee, OASIS Forlingieri, Mr. Marco, Accenture Chawla, Mr. Himanshu, Dassault Systemes Ollerton, Mr. Patrick, PTC Apperly, Mr. Hedley, PTC Chown, Bill, Siemens AG Gauthier, Mr. Eric, Thales Orhant, Mr. Jean-Christophe, Thales  Host: Schulze, Dr. Michael, pure-systems  Minute taker: Ryssel, Dr. Uwe, pure-systems  Agenda items:  - Approval of minutes for the meeting on 12.11.2018
- There are no objections from TC members, so the minutes of the last meetings are approved.
- Results of the check for relevant input from the CRYSTAL project
- Damir Nesic:
- Public reports of project CRYSTAL define ten use cases relating variation points, which were not pursued there however. 	- A more detailed analysis of these use cases is necessary.
- Presentation of Use Cases
- Uwe Ryssel:
- Presentation of three use cases (VP description, VP configuration, VP partial configuration) -> see uploaded slides
- Gilles Malfreyt:
- Impact analysis use case (need to find assets associated with features) 	- Ability of navigation between assets and variability model in tools 	  -> Arising question: Do we have to define requirements in VEL specification for the
description of corresponding assets and problem space elements?
- Stefan Mattern: 	- Use case of different binding times for the configuration of variation points 	 - Action Items until next meeting
- Every TC member should read VEL draft specification	(version uploaded to OASIS) and
give comments/remarks until the next meeting. 	- For conceptual change requests: prepare some slides and present it on the next meeting.  - Agenda Items planned for next meeting
- Discussion of potential conceptual changes in VEL
← Prev in month ← Prev in thread
Next in thread → Next in month →