office-collab — archive
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]
Multiple changes
Greetings! Sorry 'bout missing a post for yesterday on change tracking!
In the ECT proposal, there was a separate treatment of multiple changes
to the same content.
I don't have the answer but let me sketch the bramble I find myself in:
First, if there are multiple changes to a particular piece of text, is
there a presumption of fixing of state?
That is if I take text from just plain text to *bold text*, save the
text and then later come back to that *bold text* and underline the
"text" portion of it, there are clearly two change operations to be tracked.
If I don't save the text, but simply change it to bold and before
saving, also underline the "text" part, is that to be two change
operations or only one?
That is at what time does the state of the text become "fixed" so that
change tracking is engaged again?
I know I have inserted text and then changed the inserted text, with
nary a trace of the original inserted text.
I suspect there is some common rule that implementers apply but I have
no idea what it would be.
Suggestions? Hope everyone is having a great week! Patrick
--
Patrick Durusau [email protected]
Former Chair, V1 - US TAG to JTC 1/SC 34 Convener, JTC 1/SC 34/WG 3 (Topic Maps)
Editor, OpenDocument Format TC (OASIS), Project Editor ISO/IEC 26300 Co-Editor, ISO/IEC 13250-1, 13250-5 (Topic Maps)
Another Word For It (blog): http://tm.durusau.net Homepage: http://www.durusau.net Twitter: patrickDurusau
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]