[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: Minutes of Atlantic UBL TC call 10 March 2010
MINUTES OF ATLANTIC UBL TC MEETING
WEDNESDAY 10 MARCH 2010
*** NOTE change to Daylight Saving Time in the U.S. and Canada
next week. Be sure to check the timeanddate link at the top
of meeting agendas for the next two weeks!
ATTENDANCE
Kenneth Bengtsson
Peter Borresen
Jon Bosak (chair)
Tony Coates
Anne Hendry
STANDING ITEMS
Additions to the calendar:
http://ubl.xml.org/events
None.
Review of Pacific call minutes
No comments.
SCHEDULE REVIEW
See http://lists.oasis-open.org/archives/ubl/201002/msg00016.html
JB: XAdES profile was due for approval by the Security SC this
week; status request sent to Andrea.
JB: The schema generation process is going well. Final changes
to the data model due this week. Are all data model changes in
for 2.1 PRD1? Note this AI:
ACTION (2/24): TM to consult with PLB to confirm that TSC
changes cause no problems.
PLB: A single item was revised: the cardinality of Location
Coordinates was changed. We should specify a BIE for Area, but
we can pick this up along with other changes following the
first public review. The changes were made around noon on
Monday.
ACTION: JB to inform GKH that the Monday 21:30 UTC snapshot
contains the last changes.
UBL 2.1 CODE LISTS
TonyC: Estimate delivery next week.
UBL 2.1 DOCUMENTATION
An alert ubl-dev subscriber has noted that the Actor for the
Delivery role in 2.0 appears to be incorrect:
http://lists.oasis-open.org/archives/ubl-dev/201003/msg00001.html
http://lists.oasis-open.org/archives/ubl-dev/201003/msg00002.html
ACTION: TM to provide the correct language for the upcoming
documentation build.
JB: The following documentation deliverables are now in the
critical path for PRD1:
ACTION (2/24): TM to contact Martin and Audun to get
diagrams.
ACTION (2/24): TM to work on getting prose drafts together
and perform first pass on edit.
JB: Picking up some tracking items:
We will have to change the schema dependency diagram and
associated prose to reflect the revised schema generation
strategy:
http://lists.oasis-open.org/archives/ubl/201001/msg00009.html
http://lists.oasis-open.org/archives/ubl/201001/msg00015.html
http://lists.oasis-open.org/archives/ubl/201001/msg00016.html
Corresponding changes will also need to be made to the NDR
checklist after initial testing of the preliminary schemas.
UBL 2.0 IDD
JB: We haven't heard anything from Jose recently.
ACTION: KB to ping Jose.
2010 UBL TC F2F MEETING SCHEDULE
9-13 August 2010 (the week following Balisage 2010) in
Montreal: http://www.balisage.net/
(Preliminary) 7-11 February 2011 at Middle East Technical
University in Ankara: http://www.metu.edu.tr/
ACTION (2/24): JB to begin talking to Asuman about this.
Pending.
(Suggested) August 2011 Mexico
TC CONCALL SCHEDULE
See http://lists.oasis-open.org/archives/ubl/201002/msg00014.html
>>> NOTE transition to Daylight Saving Time in the U.S. and
Canada next week!
Jon Bosak
Chair, OASIS UBL TC
==================================================================
TRACKING ITEMS
UBL 2.0 NDR IMPLEMENTATION GUIDE WIKI
http://wiki.oasis-open.org/ubl/NDR_2.0_Implementation_Guide
On hold till after F2F in Copenhagen.
UBL 2.1 NAMING AND DESIGN RULES
On hold till after F2F in Copenhagen.
CCTS 2.01 DMR
ACTION (6/30): TM to circulate a draft CCTS 2.01 DMR to the
TC for review.
Pending.
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]