[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: Minutes of Atlantic UBL TC call 17 March 2010
MINUTES OF ATLANTIC UBL TC MEETING
WEDNESDAY 17 MARCH 2010
ATTENDANCE
Kenneth Bengtsson
Peter Borresen
Jon Bosak (chair)
G. Ken Holman
Zarella Rendon
Andy Schoka (back from LoA)
STANDING ITEMS
Additions to the calendar:
http://ubl.xml.org/events
None.
Review of Pacific call minutes (none this week)
UBL 2.1 SCHEMAS
GKH has uploaded an initial set; still needs code lists:
http://lists.oasis-open.org/archives/ubl/201003/msg00009.html
ACTION: JB and others to review the posted set.
ACTION: PLB to arrange for PSC review.
ACTION: AS to arrange for TSC review.
UBL 2.1 CODE LISTS
JB: TonyC reports four left to do; will still be done this
week.
GKH: When received, these will be incorporated into a new draft
set. The schemas themselves are not expected to change.
UBL 2.1 DOCUMENTATION
These items are urgently needed:
ACTION (2/24): TM to contact Martin and Audun to get
diagrams.
ACTION (2/24): TM to work on getting prose drafts together
and perform first pass on edit.
Documentation tracking items
- An alert ubl-dev subscriber has noted that the Actor for the
Delivery role in 2.0 appears to be incorrect:
http://lists.oasis-open.org/archives/ubl-dev/201003/msg00001.html
http://lists.oasis-open.org/archives/ubl-dev/201003/msg00002.html
ACTION: TM to provide the correct language for the
upcoming documentation build.
- We will have to change the schema dependency diagram and
associated prose to reflect the revised schema generation
strategy:
http://lists.oasis-open.org/archives/ubl/201001/msg00009.html
http://lists.oasis-open.org/archives/ubl/201001/msg00015.html
http://lists.oasis-open.org/archives/ubl/201001/msg00016.html
Corresponding changes will also need to be made to the NDR
checklist after initial testing of the preliminary schemas.
JB: With the success of schema generation, these documentation
items are now in the critical path.
NDR CHECK
An item for BH. (NIST check)
ACTION: JB to ping BH.
UBL 2 XADES PROFILE
JB: Oriol has requested modifications to the draft delivered to
the Security SC last week; currently in discussion.
GKH: Will have some comments on this.
JB: Note that the profile can be added without changing the
schemas. So there is a week or two before time runs out to get
a draft profile into 2.1 PRD1. Otherwise it will wait for
PRD2.
UBL 2.0 IDD VOL. 2 (PORTUGUESE)
ACTION (3/10): KB to ping Jose.
Pending.
NDR 2.1 DOCUMENTATION
JB: MC and MG are beginning to work on this in the background.
GKH: Will be reviewing the documentation to make sure that it
reflects the rules as they were instantiated in the 2.1
schemas.
2010 UBL TC F2F MEETING SCHEDULE
9-13 August 2010 (the week following Balisage 2010) in
Montreal: http://www.balisage.net/
(Preliminary) 7-11 February 2011 at Middle East Technical
University in Ankara: http://www.metu.edu.tr/
ACTION (2/24): JB to begin talking to Asuman about this.
Pending.
(Suggested) August 2011 Mexico
TC CONCALL SCHEDULE
See http://lists.oasis-open.org/archives/ubl/201002/msg00014.html
>>> NOTE transition to Daylight Saving Time in the U.S. and
Canada BUT NOT EUROPE this week
Jon Bosak
Chair, OASIS UBL TC
==================================================================
TRACKING ITEMS
UBL 2.0 NDR IMPLEMENTATION GUIDE WIKI
http://wiki.oasis-open.org/ubl/NDR_2.0_Implementation_Guide
On hold till after F2F in Copenhagen.
CCTS 2.01 DMR
ACTION (6/30): TM to circulate a draft CCTS 2.01 DMR to the
TC for review.
Pending.
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]