[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
--
[Date Index]
| [Thread Index]
XQuery 3.0 implementations vs the XQuery 3.0 Test Suite
- From: Jim Melton <jim.melton@oracle.com>
- To: "w3c-xsl-query@w3.org" <w3c-xsl-query@w3.org>,public-qt-comments@w3.org,xml-dev@lists.xml.org,talk@x-query.com
- Date: Mon, 17 Sep 2012 19:55:20 -0600
Gentle friends,
The XML Query WG, jointly with the XSLT Working Group, are nearly
ready to several several of the "3.0" suite of specifications from
Last Call Working Draft to Candidate Recommendation. The exceptions
are Serialization 3.0, which will be submitted for a second Last Call
comment period, and XSLT 3.0, which has not yet entered the Last Call
phase. (The documents being considered for advancement are XQuery
3.0, XQueryX 3.0, XPath 3.0, XDM 3.0, and F&O 3.0.)
We already have in place a very substantial test suite for XQuery
3.0, although we do not claim that it is as complete as we wish it to
be. We are currently in the process of reviewing the test suite to
determine what additional tests are needed to ensure that we can
determine our specs to be implementable as required by W3C policies.
The purpose of Candidate Recommendation is, as implied above, to
determine whether the specs are implementable, particularly that each
feature can be implemented by two or more implementations
compatibly. Therefore, as documents are transitioned to Candidate
Recommendation, a Call for Implementations is
issued. Implementations respond to that call by submitting their
results from running the test suite and by reporting bugs they've
discovered as a result.
When we transition to Candidate Recommendation, we are required to
indicate a date through which we will accept test suite results and
other comments before we consider a further transition to Proposed
Recommendation. At this point, we honestly cannot predict whether
implementors will require two weeks, two months, or two quarters
before they're able to submit results.
If you are responsible for an XQuery 3.0 implementation, please
respond to this message with your best estimate of how long from,
say, mid-October 2012 it will be until you are able to submit test
suite results.
Many thanks!
Jim
========================================================================
Jim Melton --- Editor of ISO/IEC 9075-* (SQL) Phone: +1.801.942.0144
Chair, ISO/IEC JTC1/SC32 and W3C XML Query WG Fax : +1.801.942.3345
Oracle Corporation Oracle Email: jim dot melton at oracle dot com
1930 Viscounti Drive Alternate email: jim dot melton at acm dot org
Sandy, UT 84093-1063 USA Personal email: SheltieJim at xmission dot com
========================================================================
= Facts are facts. But any opinions expressed are the opinions =
= only of myself and may or may not reflect the opinions of anybody =
= else with whom I may or may not have discussed the issues at hand. =
========================================================================
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
--
[Date Index]
| [Thread Index]