← Prev in month ← Prev in thread
Next in thread → Next in month →

Spec editing hygiene procedures Fwd: [xliff] Version Control Commit by David.Filip

From
Dr. David Filip <>
Date
2013-05-28T17:20:10+00:00
ID
CANw5LKkvg=z6eUbkB4Fg+OrkiyqFcy4=
Thread
Spec editing hygiene procedures Fwd: [xliff] Version Control Commit by David.Filip
Hi all, editors and contributors,

All material/substantive changes made to the spec compared to the csprd01 version must be made in response to public review comments.

You are OK catching a typo here and there, but do not make ANY material/substantive changes before achieving TC consensus or ballot resolution.

Note: Consensus on small change items can be reached by no one responding in a reasonable time frame specified in advance by the proponent of the solution, as advised by Bryan.

It is also OK to make isolated editorial changes in response to a comment directly in the spec and ask the stakeholders via TC list and/or comment list to check out in the next version of wd02. I create these after every commit unless there is reason not to.

In case you do not have editing set up, transition the ownership of comment changes to me after the comment you own has been disposed of materially.

If you feel a material change is due please raise the comment by tomorrow.

If you withhold necessary substantive change ideas for the second public review, one of the two things will happen

1) Your substantive change proposal will be accepted and the TC will need to call for a 3rd public review after concluding the 2nd

2) Your proposal will be rejected not to delay the progress by another public review

Also to clarify the logistics, as per last meeting minutes and the last three commit comments. We have a csprd01 snapshot stored as a tag and by editing in trunk we are changing wd02, which will eventually be progressed to csd02 and csprd02 for the 2nd public review.

Do not hesitate to ask for clarification

Cheers

dF

Dr. David Filip

=======================

LRC | CNGL | LT-Web | CSIS

University of Limerick, Ireland

telephone: +353-6120-2781

cellphone: +353-86-0222-158

facsimile: +353-6120-2734

mailto: 

---------- Forwarded message ----------
From:  <>

Date: Tue, May 28, 2013 at 5:59 PM
Subject: [xliff] Version Control Commit by David.Filip
To: 

Author: David.Filip

Date: 2013-05-28 12:59:34 -0400 (Tue, 28 May 2013)

New Revision: 262

Web View: https://tools.oasis-open.org/version-control/browse/wsvn/xliff/trunk/xliff-20/?rev=262&sc=1

Added:

   trunk/xliff-20/ReviewChangeTracking/

   trunk/xliff-20/ReviewChangeTracking/ReviewChangeTrack.xml

   trunk/xliff-20/ReviewChangeTracking/csprd01.xml

Modified:

   trunk/xliff-20/xliff-core-v2.0-wd02.html

   trunk/xliff-20/xliff-core-v2.0-wd02.pdf

   trunk/xliff-20/xliff-core-v2.0-wd02.xml

   trunk/xliff-20/xliff-core.html

   trunk/xliff-20/xliff-core.pdf

   trunk/xliff-20/xliff-core.xml

   trunk/xliff-20/xliff20.xml

Log:

Added Specification Change Tracking Appendix

---------------------------------------------------------

It is a TC Process REQUIREMENT that changes made between Public Reviews are tracked.

All changes made in responses to PR comments MUST be tracked in this Appendix.

No other changes SHOULD be made, no other material changes MUST be made.

---------------------------------------------------------------------

To unsubscribe from this mail list, you must leave the OASIS TC that

generates this mail.  Follow this link to all your TCs in OASIS at:

https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php
← Prev in month ← Prev in thread
Next in thread → Next in month →