| Groups - Energy Interoperation TC Weekly Teleconference modified |
4 |
2011-09-07 |
| FW: Use of Applicable Location in eiDistributeQuote |
2 |
2011-09-09 |
| Groups - energyinterop-1-0-schema-wd28-wip1.zip uploaded |
1 |
2011-09-11 |
| Groups - energyinterop-1-0-schema-wd28-wip2.zip uploaded |
1 |
2011-09-12 |
| RE: EI ResponseTypes |
1 |
2011-09-13 |
| Feedback proposals and questions |
7 |
2011-09-13 |
| Groups - feedback_questions_20110913.pdf (feedback_questions_20110913.pdf) uploaded |
1 |
2011-09-13 |
| Groups - WSDL template (EnergyInteropWSDL-template.wsdl) uploaded |
1 |
2011-09-13 |
| Groups - Streams and Energy Interoperation D2 20110914.docx uploaded |
1 |
2011-09-14 |
| Groups - Streams and Energy Interoperation D2 20110914.pdf uploaded |
1 |
2011-09-14 |
| Groups - gml_subset.xsd uploaded |
1 |
2011-09-14 |
| Groups - energyinterop-1-0-schema-wd28-wip2-ed-payload_changes.zip (energyinterop-1-0-schema-wd28-wip2-ed-payload_changes.zip) uploaded |
1 |
2011-09-16 |
| Groups - energyinterop-1-0-schema-wd28-wip3.zip uploaded |
1 |
2011-09-19 |
| Jira work flow, steps to move from Open to Resolved |
1 |
2011-09-19 |
| Groups - Next rev of schema changes uploaded |
1 |
2011-09-19 |
| Groups - energyinterop-1-0-schema-wd28-wip2-ed-payload_changes_v2.zip modified |
1 |
2011-09-19 |
| Schema WIPs and Resolved Issues |
1 |
2011-09-19 |
| Groups - energyinterop-1-0-schema-wd28-wip4.zip uploaded |
1 |
2011-09-20 |
| Applying Jira changes |
1 |
2011-09-20 |
| Groups - Event "Energy Interoperation TC Weekly Teleconference" modified |
4 |
2011-09-20 |
| Created Feedback Collector in Jira |
1 |
2011-09-21 |
| Groups - Signals and Streams rough cut.pdf uploaded |
1 |
2011-09-21 |
| Schema structure item |
1 |
2011-09-21 |
| Groups - Schedules and Sequences in Energy Interoperation.pdf uploaded |
2 |
2011-09-25 |
| Streams, Events, EventBases, and Feedback. |
1 |
2011-09-25 |
| Groups - energyinterop-1-0-schema-wd28-wip5.zip uploaded |
1 |
2011-09-25 |
| Groups - The Big bag of Energy Interoperation Definitions.docx uploaded |
1 |
2011-09-25 |
| Groups - The Big bag of Energy Interoperation Definitions.pdf uploaded |
1 |
2011-09-25 |
| Groups - energyinterop-1-0-spec-wd28-with-changes.docx uploaded |
1 |
2011-09-26 |
| Groups - energyinterop-1-0-spec-wd28.docx uploaded |
1 |
2011-09-26 |
| Groups - energyinterop-1-0-spec-wd28-diff-from-wd27.pdf uploaded |
1 |
2011-09-26 |
| Groups - energyinterop-1-0-spec-wd28.pdf uploaded |
1 |
2011-09-26 |
| Groups - energyinterop-1-0-schema-wd28.zip uploaded |
2 |
2011-09-26 |
| Groups - EnergyInterop Minutes 20110907 uploaded |
1 |
2011-09-26 |
| Sorry about the flurry |
1 |
2011-09-26 |
| Groups - EnergyInterop Minutes 20110921 uploaded |
1 |
2011-09-27 |
| Groups - EnergyInterop Minutes 20110914 uploaded |
1 |
2011-09-27 |
| Groups - Proposed Chapter 4 for WD29 D1.pdf uploaded |
1 |
2011-09-27 |
| Groups - energyinterop-1-0-schema-wd29-wip1.zip uploaded |
1 |
2011-09-28 |
| Groups - EnergyInterop Minutes 20110928 uploaded |
1 |
2011-09-28 |
| EITC discussion on payloads, EiEnroll, EiFeedback, and related issues - Wednesday 9/28 2pm EDT |
1 |
2011-09-28 |
| Participate in Open Smart Grid Reference Model standardization at OASIS |
2 |
2011-09-28 |