OASIS Open Mailing List Archives  ·  All Lists  ·  emix  ·  2011-02

emix — archive

[Date Prev]  |  [Thread Prev]  |  [Thread Next]  |  [Date Next]   —  [Date Index]  |  [Thread Index]  |  [Month Index]  |  [List Home]

Can you do it again?


They are Constraints. Bruce Bartell Xtensible Solutions Mobile : +1.321.258.6500 [email protected]    www.xtensible.net From: Toby Considine [mailto:[email protected]] On Behalf Of Toby Considine Sent: Friday, February 18, 2011 10:55 AM To: [email protected] Subject: [emix] Can you do it again? There are a wide number of attributes identified by the IRC/UCAIug as present in the CIM but left out of the current spec. Some of them are Energy Interop, some meta-information about resources and resource availability. How often resource can perform? How long to recover since last time performed? Maximum length of time it can perform at one time. Maximum times per [day] that it will tolerate being asked to perform Etc I am imagining creating a new interface object (the Pawpaw, continuing our fruit conversation) that is a complex type encompassing this suite of attributes, and making an object of that type an optional element of every resource. 1) Any Objections? 2) What is the proper name of the Pawpaw Tc Pickin' up paw-paws, put 'em in your pockets, Pickin' up paw-paws, put 'em in your pockets, Pickin' up paw-paws, put 'em in your pockets, Way down yonder in the paw-patch. “It is difficult to get a man to understand something, when his salary depends upon his not understanding it” -- Upton Sinclair. Toby Considine TC9, Inc OASIS Technical Advisory Board TC Chair: oBIX & WS-Calendar TC Editor: EMIX, EnergyInterop U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee Email: [email protected] Phone: (919)619-2104 http://www.tcnine.com/ blog: www.NewDaedalus.com

[Date Prev]  |  [Thread Prev]  |  [Thread Next]  |  [Date Next]   —  [Date Index]  |  [Thread Index]  |  [Month Index]  |  [List Home]