RE: [emix] Not To Exceed

From
Phil Davis <>
Date
2010-03-11T17:48:26+00:00
ID
Thread
RE: [emix] Not To Exceed
Drat! 
Of all the sessions to miss, this topic (M&V) is where I have spent years of 
"quality" time.  Darn those pesky customers, anyway.  A few key point 
in the field application of DR:

 

1.  The ISO's have market rules that can result in calls for 
increased loads (regulation support) under certain circumstances, so the result 
of DR (response, not reduction) can be +/-.  The + is rare but growing, and 
promises to be the crux of DR 3.0.

 

2.  In traditional DR programs, there are three constructs, and 
not all have baselines.  Most commonly,  baselines are calculated 
from the the past N days' demand excluding certain types of days, but 
regardless, that formula is decreed by market rule.  When an event is 
called, current status is not terribly relevant as the goal is to perform in 
relationship to the established baseline.  In some cases, the customer may 
already be there due to circumstance, or it may be impossible to get there, 
again due to circumstance.  Macht nichts as far as the ISO is 
concerned.

 

An 
outgrowth of that conundrum is that some market rules call for a reduction 
against that baseline, some call for a reduction to a specific level (no 
baseline), and others call for a reduction by a specific amount from current 
state ("instant" baseline).  There is a variant that involves guarantee not 
to exceed a certain value, but to me, this is the obverse of dropping to a 
specific level.

 

3.  Verification does involve the revenue meter but in today's 
world, this is not a direct link.  While there may be leads attached to 
revenue meters, most often, the demand data submitted for 
settlement comes from submeters, CT's, or control system consoles.  
Over time (and it can be a long time), this settlement data is validated against 
the utility meter and payment is made if the two agree within a preset tolerance 
level.  There is never an exact match since DR events and utility read 
intervals almost never sync.

 

There 
are countless variations.  On site generation can use name plate data 
rather then metered data, for example, and I've even seen settlements based on 
the amount of diesel consumed during events.  Never underestimate an 
engineer's ability to introduce complexity.

 

As my 
kids would say TL;DR (google it, old folks).

 

At 
your service.

Phil

________________________________________________________________________________________________
Phil 
Davis | Senior Manager | Schneider Electric Demand Response 
Resource Center | 3103 Medlock 
Bridge Road, Ste 100 | Norcross, 
GA  30071 | (: 404.567.6090 | 7: 678.672.2433 | 
*:  | : Website:  http://www.schneider-electric.com

 

From: Old, Bob [mailto:] 

Sent: Thursday, March 11, 2010 12:15 PM
To: Energy Interop; 

Subject: FW: [emix] Not To 
Exceed

Sorry Toby, I forgot to click 
reply-all.

 

Robert Old

Siemens Industry, 
Inc.

Building 
Technologies

1000 Deerfield 
Pkwy.

Buffalo Grove, IL 
60089-4513

Tel.: +1 (847) 
941-5623

Skype: 
bobold2



www.siemens.com

 

From: Old, Bob 

Sent: Thursday, March 11, 2010 11:13 AM
To: 
''
Subject: RE: [emix] Not To 
Exceed

 

My expectation for verification 
is that the utility meter information is required.  I’ve also heard that in 
a curtailment scenario, just promising to reduce load by a certain amount around 
uncertain beginning and end points is a non-starter.  

 

The programs I’ve heard of give 
you a baseline for the next day, below which you have to reduce by some 
program-determined amount and for which you get a program-determined level of 
compensation.  Sometimes the program specifies that the baseline will be 
calculated on something like “the highest/lowest usage over 5 of the last 6 day 
which don’t include weekends/holidays/days with an event called.”  But 
sometimes they just give you the number and you do your own modeling. 

 

We’re talking money here.  
It needs a revenue grade meter.

 

Best,

B.O.  March 11, 
2010

 

Robert Old

Siemens Industry, 
Inc.

Building 
Technologies

1000 Deerfield 
Pkwy.

Buffalo Grove, IL 
60089-4513

Tel.: +1 (847) 
941-5623

Skype: 
bobold2



www.siemens.com

 

From: Toby Considine 
[mailto:] On Behalf Of Toby 
Considine
Sent: Thursday, March 11, 2010 10:43 AM
To: 
; 
Subject: 
[emix] Not To Exceed

 

DR – and Verification, and 
Verification is the conundrum. Verification is the problem because DR are is a 
promise to reduce load by a certain amount from an uncertain beginning end point 
to an unknown end point.

 

What about an agreement that “I 
will use no more than xxx” as a DR offering. It becomes entirely results 
oriented (good for a service). It would be more valuable if it warranted “no 
spikes” rather than merely total use for a [15 minute] period. It certainly 
would be callable.

 

Do we adopt this? If so,  
does it look like

 

[emix – this is for max 
use]

 

Or does it look 
like

 

[Eitc: I will commit not to 
exceed

    
[emix]

]

 

In other words, is max an EITC or 
EMIX thing…

 

tc

 

"Energy and 
persistence conquer all things." -- Benjamin Franklin 

  
  

    
      
Toby Considine
TC9, Inc

      
OASIS Technical Advisory Board
TC Chair: oBIX & 
      WS-Calendar

      
TC Editor: EMIX, 
      EnergyInterop

    
      
  

    
      
Email: 

      
Phone: (919)619-2104

      
http://www.tcnine.com/

      
blog: www.NewDaedalus.com

 

 

________________________________________________________________________
This 
email has been scanned for SPAM content and Viruses by the MessageL
abs Email 
Security 
System.
________________________________________________________________________