energyinterop

← back

426 messages · 317 threads

# Subject From Date
00000 Groups - Energy Interoperation TC Workshop Meeting cancelled [email protected] 2010-11-01 04:31
00001 Groups - energyinterop-1 0-spec-wd-14.docx uploaded [email protected] 2010-11-01 07:03
00002 Groups - energyinterop-1 0-spec-wd-14.docx uploaded [email protected] 2010-11-01 07:06
00003 Groups - energyinterop-1 0-spec-wd-14.pdf uploaded [email protected] 2010-11-01 07:09
00004 Groups - energyinterop-1 0-spec-wd-14a.pdf uploaded [email protected] 2010-11-01 07:29
00005 RE: [energyinterop] Groups - Energy Interoperation TC Workshop Meeting cancelled Bruce Bartell 2010-11-01 18:04
00006 Groups - Alternate Section 3 20101101.pdf uploaded [email protected] 2010-11-02 02:00
00007 Review document details for OASIS Energy Interoperation November2 William Cox 2010-11-02 02:17
00008 Re: Review document details for OASIS Energy Interoperation November2 + Schedule Details and NAESB Phase 2 PAP09 requirements William Cox 2010-11-02 02:27
00009 UPDATED Phone/Web for Nov 2-3 PAP09 + OASIS Energy Interoperation+ NAESB Phase 2 PAP09 requirements William Cox 2010-11-02 14:07
00010 FW: NAESB Draft Documents Toby Considine 2010-11-02 18:51
00011 FW: EPA Climate Control 2.0 "Soby Donsidine" 2010-11-02 20:54
00012 Energy Interop today: NAESB Phase II review 10:30-12:00 Holmberg, David 2010-11-03 13:27
00013 Re: [energyinterop] Energy Interop today: NAESB Phase II review 10:30-12:00 William Cox 2010-11-03 13:48
00014 NAESB documents and links are on the twiki and the NAESB site (higherperformance so start there) William Cox 2010-11-03 14:44
00015 Prices Absolute, Relative, and Programmed... Toby Considine 2010-11-03 15:27
00016 RE: [emix] Prices Absolute, Relative, and Programmed... Crimmins, Sean 2010-11-03 16:15
00017 Re: [energyinterop] RE: [emix] Prices Absolute, Relative, and Programmed... Hirish Hhatikar 2010-11-03 17:12
00018 RE: [energyinterop] RE: [emix] Prices Absolute, Relative, and Programmed... Toby Considine 2010-11-03 17:32
00019 RE: [energyinterop] RE: [emix] Prices Absolute, Relative, and Programmed... Bruce Bartell 2010-11-04 15:09
00020 RE: [energyinterop] RE: [emix] Prices Absolute, Relative, andProgrammed... Crimmins, Sean 2010-11-04 17:19
00021 RE: [energyinterop] RE: [emix] Prices Absolute, Relative, and Programmed... Bruce Bartell 2010-11-04 20:00
00022 Re: [energyinterop] RE: [emix] Prices Absolute, Relative, and Programmed... Hirish Hhatikar 2010-11-04 22:17
00023 RE: [emix] Re: [energyinterop] RE: [emix] Prices Absolute, Relative, and Programmed... Toby Considine 2010-11-05 10:23
00024 Re: [emix] Re: [energyinterop] RE: [emix] Prices Absolute, Relative,and Programmed... Hirish Hhatikar 2010-11-05 19:03
00025 Groups - EnergyInterop Minutes 20101027 (EnergyInterop Minutes 20101027.doc) uploaded [email protected] 2010-11-06 00:05
00026 Groups - energyinterop-1 0-spec-wd-15-editors-1-p20-28.pdf uploaded [email protected] 2010-11-10 15:27
00027 Groups - Energy Interoperation TC Weekly Teleconference modified [email protected] 2010-11-10 15:38
00028 Groups - EiConstraintCorrected20101110.jpg uploaded [email protected] 2010-11-10 15:50
00029 Groups - Energy Interoperation TC Weekly Teleconference modified [email protected] 2010-11-10 15:55
00030 Groups - PAP09 20101102 Review Contributed.xls uploaded [email protected] 2010-11-12 20:08
00031 [OASIS Issue Tracker] Created: (ENERGYINTEROP-147) 217 - Should bea dotted from generator to the consumer. OASIS Issues Tracker 2010-11-16 06:05
00032 [OASIS Issue Tracker] Created: (ENERGYINTEROP-148) 217 - Calling it"local generation" will clarify OASIS Issues Tracker 2010-11-16 06:07
00033 [OASIS Issue Tracker] Created: (ENERGYINTEROP-149) 226 - granularis ambiguous OASIS Issues Tracker 2010-11-16 06:09
00034 [OASIS Issue Tracker] Created: (ENERGYINTEROP-150) 231 - "Energyconsumers" line.... Need better explanation. Unclear how manage your localenergy supply. Seems curtailment is not part of their local energy supply. OASIS Issues Tracker 2010-11-16 06:11
00035 [OASIS Issue Tracker] Created: (ENERGYINTEROP-151) General - Inlanguage for EI Scope and in the dirgram, transmission and distributiondomains are ignored. Are we ignoring these from the rest 7 domains? Are wetotally ignoring those interactions and the rest of the SG? OASIS Issues Tracker 2010-11-16 06:11
00036 [OASIS Issue Tracker] Created: (ENERGYINTEROP-152) 352, 363 -Elsewhere use "consumer" - in REC "members".Here use "customer"."consumers" is more accurate. OASIS Issues Tracker 2010-11-16 06:11
00037 [OASIS Issue Tracker] Created: (ENERGYINTEROP-153) 341 - Rewritesection OASIS Issues Tracker 2010-11-16 06:13
00038 [OASIS Issue Tracker] Created: (ENERGYINTEROP-154) 377 - In scope -info models for contract and product distrib. Explain. Is productconnection the product definition in EMIX? OASIS Issues Tracker 2010-11-16 06:13
00039 [OASIS Issue Tracker] Created: (ENERGYINTEROP-155) 374-5 - Alsocould include supply projections. And consider bidirectional energy flow. OASIS Issues Tracker 2010-11-16 06:15
00040 [OASIS Issue Tracker] Created: (ENERGYINTEROP-156) 383 - Commmethod other than WS is out of scope - clarify that highlight. Defines atransport. Make sure to the casual reader that they can tell. Make surethat Web services is clear as transport protocol OASIS Issues Tracker 2010-11-16 06:15
00041 [OASIS Issue Tracker] Created: (ENERGYINTEROP-157) 414 - Movingtarget - rewrite to current "tender" etc OASIS Issues Tracker 2010-11-16 06:15
00042 [OASIS Issue Tracker] Created: (ENERGYINTEROP-158) 402 - Good intro- CIM alignment OASIS Issues Tracker 2010-11-16 06:17
00043 [OASIS Issue Tracker] Created: (ENERGYINTEROP-159) 401-407 -Looking at 4 essential market activites. Where is (or is not) thedistribution of day ahead price/RTP? OASIS Issues Tracker 2010-11-16 06:17
00044 [OASIS Issue Tracker] Created: (ENERGYINTEROP-160) 404 - In EMIXwe're moving from offers to bids; need to clarify here OASIS Issues Tracker 2010-11-16 06:19
00045 [OASIS Issue Tracker] Created: (ENERGYINTEROP-161) 397 - Assumestimely automated metering? Also automated pricing information OASIS Issues Tracker 2010-11-16 06:19
00046 [OASIS Issue Tracker] Created: (ENERGYINTEROP-162) 435, 454-455 -Are buyers and seller defined before? The place you get tripped up arewords used every day. OASIS Issues Tracker 2010-11-16 06:19
00047 [OASIS Issue Tracker] Created: (ENERGYINTEROP-163) 468 - ReferenceTEMIX and EMIX. More examples. OASIS Issues Tracker 2010-11-16 06:21
00048 [OASIS Issue Tracker] Created: (ENERGYINTEROP-164) 469 - Defineterminology - define or refererence. OASIS Issues Tracker 2010-11-16 06:21
00049 [OASIS Issue Tracker] Created: (ENERGYINTEROP-165) 472, 477 - Typo- promissee should be promissor OASIS Issues Tracker 2010-11-16 06:21
00056 [OASIS Issue Tracker] Created: (ENERGYINTEROP-166) 492 - RedundantIJK,...in drawing. Why is [last] K and second level C & D shown? They'renot doing anything. OASIS Issues Tracker 2010-11-16 06:23
00057 [OASIS Issue Tracker] Created: (ENERGYINTEROP-167) 492, 500 - If Ais a Distributed Generation fac - will it reverse roles? When does it? Incorporate in new section 3 OASIS Issues Tracker 2010-11-16 06:25
00058 [OASIS Issue Tracker] Created: (ENERGYINTEROP-168) 587-591 -Accidentally had a thought - when you have the service naming.On theoperation - may want to insert EiEvent to distinguish - objects shouldmatch the service name. Helps when you throw it over the wall to a softwaredevelopment. OASIS Issues Tracker 2010-11-16 06:25
00050 [OASIS Issue Tracker] Created: (ENERGYINTEROP-169) 610 - Looking atrelationship of events for the deployment level. OASIS Issues Tracker 2010-11-16 06:27
00051 [OASIS Issue Tracker] Created: (ENERGYINTEROP-170) 610 - In theevent info you're limited to events relating to active power. Should beable to support any measurement. Quantity you're measuring by - why notgas, water, reactive? OASIS Issues Tracker 2010-11-16 06:27
00052 [OASIS Issue Tracker] Created: (ENERGYINTEROP-171) 613 - One -issues about gluon OASIS Issues Tracker 2010-11-16 06:27
00053 [OASIS Issue Tracker] Created: (ENERGYINTEROP-172) Sections 6.3 and6.4 - Sections list services. Documentation looks pretty good. Do youintend/would it be a good idea to present state machines that show thevarious states for this and the lifecycles? OASIS Issues Tracker 2010-11-16 06:29
00054 [OASIS Issue Tracker] Created: (ENERGYINTEROP-173) All sections,and 796 - Combine - each section where you have a class of services, have astructure where you present models, schema fragments, and sequence diagramsthat illustrate how a service works. Easier to digest for the readers. OASIS Issues Tracker 2010-11-16 06:29
00055 [OASIS Issue Tracker] Created: (ENERGYINTEROP-174) Section 12 -Purpose of the section? Objective? Asumptions for marty OASIS Issues Tracker 2010-11-16 06:29
00059 [OASIS Issue Tracker] Created: (ENERGYINTEROP-175) General - Notmuch time to analyze the UML. Didn't see references to EMIX OASIS Issues Tracker 2010-11-16 06:31
00060 [OASIS Issue Tracker] Created: (ENERGYINTEROP-176) 588 - Go back tol588. Meat so far. Need more gap analysis. OASIS Issues Tracker 2010-11-16 06:33
00061 [OASIS Issue Tracker] Created: (ENERGYINTEROP-177) 591 - Comment onl591 - dig deeper and understand what it means. If want to transmit aprice...simpler. An EiEvent never contains a price. Agree with M should beable to include other data items. No notion of the simple levels of pricefrom OpenADR. OASIS Issues Tracker 2010-11-16 06:33
00062 [OASIS Issue Tracker] Created: (ENERGYINTEROP-178) General - Goingto have to have - BB argument -- a better undersanding of hosw thescheds/intervals are tied to the event info type. OASIS Issues Tracker 2010-11-16 06:35
00063 [OASIS Issue Tracker] Created: (ENERGYINTEROP-179) 591 - Send allthree - price rel, current, and H/L/M?WTC OASIS Issues Tracker 2010-11-16 06:35
00064 [OASIS Issue Tracker] Created: (ENERGYINTEROP-180) General - Simplelevels - not semantically coupled to anytyhing in the signals there OASIS Issues Tracker 2010-11-16 06:35
00065 [OASIS Issue Tracker] Created: (ENERGYINTEROP-181) General - Don'tsee simple price levels -- can be an instance of the eventinfo type OASIS Issues Tracker 2010-11-16 06:37
00066 [OASIS Issue Tracker] Created: (ENERGYINTEROP-182) General - Need abetter understanding of how schedules are tied to eventinfo type. OASIS Issues Tracker 2010-11-16 06:37
00067 [OASIS Issue Tracker] Created: (ENERGYINTEROP-183) General - Dynprice, not just real time prices. OASIS Issues Tracker 2010-11-16 06:39
00068 [OASIS Issue Tracker] Created: (ENERGYINTEROP-184) General - WRTthe simplified L/M/H (Normal/Mod/High) has to be included - critical forcompatibility and ease of use of information. OASIS Issues Tracker 2010-11-16 06:41
00069 [OASIS Issue Tracker] Created: (ENERGYINTEROP-185) General - Directreaction to Rish - understand toasters need HML, interact with those. Whatare the conformance rules for HML? If it's only kinda high or medium? OASIS Issues Tracker 2010-11-16 06:41
00070 [OASIS Issue Tracker] Created: (ENERGYINTEROP-186) General - Evenat edge conformance group. Go to OpenADR. OASIS Issues Tracker 2010-11-16 06:43
00071 [OASIS Issue Tracker] Created: (ENERGYINTEROP-187) General - Pricemeans a lot to customer, not a lot to customer load shed strategies unlesscustomer can respond to a spec price...has to be some exchange from a priceto a level - up to the program to decide. Communication has to be possible. OASIS Issues Tracker 2010-11-16 06:43
00072 [OASIS Issue Tracker] Created: (ENERGYINTEROP-188) General -Talking to CAISO - they understand the logic behind this. They are lookinginto providing level for the different situations, rather than or on top ofcomm price. OASIS Issues Tracker 2010-11-16 06:45
00073 [OASIS Issue Tracker] Created: (ENERGYINTEROP-189) General - Twointerp you can give to a level that you exchanged. One is that you'veexchanged/sent a price table, and the label is an index into the table. Inscope for PAP09 and EI. The other is information for load shedding. ThenDLC is another thing. OASIS Issues Tracker 2010-11-16 06:47
00074 [OASIS Issue Tracker] Created: (ENERGYINTEROP-190) General - Bigrequest for BAS - give us one standard, don't change it. OASIS Issues Tracker 2010-11-16 06:49
00075 [OASIS Issue Tracker] Created: (ENERGYINTEROP-191) General - Onething is a model : DR is done by having a building integrator spend 2weeks. OASIS Issues Tracker 2010-11-16 06:49
00076 [OASIS Issue Tracker] Created: (ENERGYINTEROP-192) General - Atoaster in CA that sheds 10MW using simple levels. Address the issue -different system integrators for different programs. OASIS Issues Tracker 2010-11-16 06:51
00077 [OASIS Issue Tracker] Created: (ENERGYINTEROP-193) General - Beatthe horse - we've identifed the issue with respect to levels OASIS Issues Tracker 2010-11-16 06:51
00078 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-179) 591 - Send allthree - price rel, current, and H/L/M?WTC OASIS Issues Tracker 2010-11-16 14:49
00079 Groups - EnergyInterop Minutes 20101110 (EnergyInterop Minutes 20101110.doc) uploaded [email protected] 2010-11-16 21:29
00080 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-131) Real-timeprice for any amount of energy is not just for EMIX OASIS Issues Tracker 2010-11-17 02:03
00081 Groups - energyinterop-1 0-spec-wd-15-editors-2-Section-4-5.pdf uploaded [email protected] 2010-11-17 08:54
00082 Groups - energyinterop-1 0-spec-wd-15-editors-2-Section-7.pdf uploaded [email protected] 2010-11-17 08:55
00083 Groups - Energy Interoperation TC Weekly Teleconference modified [email protected] 2010-11-17 09:05
00084 Resource Descriptions for Energy Interop "Soby Donsidine" 2010-11-17 17:16
00085 Document Schedules and review by Saturday Toby Considine 2010-11-18 01:09
00086 Groups - energyinterop-1 0-spec-wd-15 with changes.docx uploaded [email protected] 2010-11-18 01:31
00087 Groups - energyinterop-1 0-spec-wd-15 with changes.pdf uploaded [email protected] 2010-11-18 01:32
00088 Groups - energyinterop-1 0-spec-wd-15.docx uploaded [email protected] 2010-11-18 01:35
00089 Groups - energyinterop-1 0-spec-wd-15.pdf uploaded [email protected] 2010-11-18 01:38
00090 Schedule for the next 10 days - Call to Action Toby Considine 2010-11-18 01:56
00091 Catching up Jira with the latest draft Toby Considine 2010-11-18 14:35
00092 [OASIS Issue Tracker] Created: (ENERGYINTEROP-194) Figures 2,3,4,7refer to ERM party. I do not see that term defined. OASIS Issues Tracker 2010-11-18 23:29
00093 [OASIS Issue Tracker] Created: (ENERGYINTEROP-195) Lines 598, 604where is the interaction for DR Standing Bid defined? OASIS Issues Tracker 2010-11-18 23:31
00094 [OASIS Issue Tracker] Created: (ENERGYINTEROP-196) Lines 649, 624Figure 10 identifies EISend... and EISent payloads. There is no matchingservice in the table on line 624. OASIS Issues Tracker 2010-11-18 23:31
00095 [OASIS Issue Tracker] Created: (ENERGYINTEROP-197) Line 624. "aprice event is performed using a SendQuote operation" is followed by tablewith xxEvent operations. OASIS Issues Tracker 2010-11-18 23:33
00096 [OASIS Issue Tracker] Created: (ENERGYINTEROP-198) Line 655Feedback is provided by both Asset and Resource. Add Resource associationor ID reference. OASIS Issues Tracker 2010-11-18 23:33
00097 [OASIS Issue Tracker] Created: (ENERGYINTEROP-199) Line 685:Constraints are applicable to Both Asset and Resource. OASIS Issues Tracker 2010-11-18 23:33
00098 [OASIS Issue Tracker] Created: (ENERGYINTEROP-200) Line 689: Whereis the class / complex data type EIConstraintBehavior defined? OASIS Issues Tracker 2010-11-18 23:35
00099 [OASIS Issue Tracker] Created: (ENERGYINTEROP-201) Line 706: OptOutequivalent in IRC model includes: economic, emergency, must run, notparticipating, outage run status, override status, participating. OASIS Issues Tracker 2010-11-18 23:37
00100 [OASIS Issue Tracker] Created: (ENERGYINTEROP-202) Line 710 Figure16 - Opt out is applicable to both asset and resource. OASIS Issues Tracker 2010-11-18 23:37
00101 [OASIS Issue Tracker] Created: (ENERGYINTEROP-203) Line 718 Section7.3.1 - Feedback vs. Status OASIS Issues Tracker 2010-11-18 23:39
00102 [OASIS Issue Tracker] Created: (ENERGYINTEROP-204) Line 721 Statusis applicable to both asset and resource. OASIS Issues Tracker 2010-11-18 23:39
00103 [OASIS Issue Tracker] Created: (ENERGYINTEROP-205) Line 721:testEvent should be expanded from Boolean to allow for indication of othertypes of Events: Advanced (Normal), Immediate, Audit/Test. OASIS Issues Tracker 2010-11-18 23:41
00104 Groups - energyinterop-1 0-spec-wd-16 with changes.docx uploaded [email protected] 2010-11-19 02:57
00105 Groups - energyinterop-1 0-spec-wd-16.docx uploaded [email protected] 2010-11-19 03:03
00106 Groups - energyinterop-1 0-spec-wd-16.pdf uploaded [email protected] 2010-11-19 03:07
00107 [OASIS Issue Tracker] Created: (ENERGYINTEROP-206) Line 323 andSection 5: EI DR DLC approaches not addressed elsewhere in the document OASIS Issues Tracker 2010-11-19 19:45
00108 RE: [energyinterop] Schedule for the next 10 days - Call to Action Bruce Bartell 2010-11-19 21:29
00109 [OASIS Issue Tracker] Created: (ENERGYINTEROP-207) Critical:Include simple client information in EiEvent Service text and figure 9(WD15, ln. 619-644, figure 9) OASIS Issues Tracker 2010-11-20 17:55
00110 [OASIS Issue Tracker] Created: (ENERGYINTEROP-208) Critical:Provide mechanism for events schedules inside of EiEvent Service (WD 15,ln. 627-644) OASIS Issues Tracker 2010-11-20 17:57
00111 [OASIS Issue Tracker] Created: (ENERGYINTEROP-209) Critical: Removedependencies to WSCal via EMIX (WD15, ln 642-644, figure 9) OASIS Issues Tracker 2010-11-20 17:57
00112 [OASIS Issue Tracker] Created: (ENERGYINTEROP-210) Critical: UMLClass Diagrams for EiEvent and Associated Classes, Operation Payloads(WD15, ln. 643-649) OASIS Issues Tracker 2010-11-20 17:59
00113 [OASIS Issue Tracker] Created: (ENERGYINTEROP-211) Critical:Provide mechanism for dynamic pricing EventInfoTypeID (WD15, pg 642-644) OASIS Issues Tracker 2010-11-20 18:03
00114 [OASIS Issue Tracker] Created: (ENERGYINTEROP-212) UML ClassDiagrams for EiEvent and Associated Classes, Operation Payloads (WD15, ln.643-649) OASIS Issues Tracker 2010-11-20 18:05
00115 [OASIS Issue Tracker] Created: (ENERGYINTEROP-213) Include non-normreference for resource definition (EI/ EMIX) OASIS Issues Tracker 2010-11-20 18:05
00116 [OASIS Issue Tracker] Created: (ENERGYINTEROP-214) Add a mechanismfor VEN to send status information to VTNs - a with request from VTN (WD15,section 5): OASIS Issues Tracker 2010-11-20 18:07
00117 [OASIS Issue Tracker] Created: (ENERGYINTEROP-215) Remove 0-* asoptional requirements/services/elements as it creates interoperabilitychallenges (WD15, ln 643-649) OASIS Issues Tracker 2010-11-20 18:07
00118 [OASIS Issue Tracker] Created: (ENERGYINTEROP-216) Critical:Provide a mechanism for load bidding information in EiEvent (WD15, 643-649) OASIS Issues Tracker 2010-11-20 18:09
00119 [OASIS Issue Tracker] Created: (ENERGYINTEROP-217) Create a supportservice (WD 15, 16; section 7) OASIS Issues Tracker 2010-11-20 18:11
00120 [OASIS Issue Tracker] Created: (ENERGYINTEROP-218) line 460: "Thiswork assumes that there is no direct interaction across the ESI." Howeverthere are assets on the other side of the ESI that have direct interationin eiEvent and eiConstraint. OASIS Issues Tracker 2010-11-20 18:41
00121 [OASIS Issue Tracker] Created: (ENERGYINTEROP-219) Line 402 : "callfor performance" need further clarification OASIS Issues Tracker 2010-11-20 18:51
00122 [OASIS Issue Tracker] Created: (ENERGYINTEROP-220) line 517:Structure of Interactions is different for Transactive Services and VTN/VENServices OASIS Issues Tracker 2010-11-20 19:13
00123 [OASIS Issue Tracker] Created: (ENERGYINTEROP-221) line 611 andChapter 6 : move event services and chapter 5 to follow TransactiveServices OASIS Issues Tracker 2010-11-20 19:23
00124 [OASIS Issue Tracker] Created: (ENERGYINTEROP-222) line 660: ChangeTransaction Services to Transactive Services consistent with first line ofsection. OASIS Issues Tracker 2010-11-20 19:31
00125 [OASIS Issue Tracker] Created: (ENERGYINTEROP-223) line 697 andline 702 (table): There is no operation to delete a quote yet the tablehas EIDeleteQuote OASIS Issues Tracker 2010-11-20 19:39
00126 [OASIS Issue Tracker] Created: (ENERGYINTEROP-224) line 716regarding possible change of "Contract to Aggreement" OASIS Issues Tracker 2010-11-20 20:37
00127 [OASIS Issue Tracker] Created: (ENERGYINTEROP-225) Promote venIDand vtnID to be attribute of EiEvent(WD16 - 647) OASIS Issues Tracker 2010-11-20 20:53
00128 [OASIS Issue Tracker] Created: (ENERGYINTEROP-226) Add descriptionsof UML attributes to the document OASIS Issues Tracker 2010-11-20 20:55
00129 [OASIS Issue Tracker] Created: (ENERGYINTEROP-227) Need moreexplicit definition of how wscal::Sequnce is used to describe the EiEventtime periods (WD16 - 642) OASIS Issues Tracker 2010-11-20 21:01
00130 [OASIS Issue Tracker] Created: (ENERGYINTEROP-228) Line 618: Needto be clear that events can be raised for any valid reason agreed to by theparties to a transaction. OASIS Issues Tracker 2010-11-20 21:07
00131 [OASIS Issue Tracker] Created: (ENERGYINTEROP-229) Locationattributes within EiEvent are weak. (WD16 - 642) OASIS Issues Tracker 2010-11-20 21:07
00132 [OASIS Issue Tracker] Created: (ENERGYINTEROP-230) Figures 2, 3,and 4 are labeled ERM and Participant. They should be labels VTN and VEN OASIS Issues Tracker 2010-11-20 21:15
00133 [OASIS Issue Tracker] Created: (ENERGYINTEROP-231) Need a locationfor the permanent location of the EPRI/Horst paper OASIS Issues Tracker 2010-11-20 21:15
00134 [OASIS Issue Tracker] Created: (ENERGYINTEROP-232) Need moredetailed specification of the interaction models, specifically around theacknowldgement of the reception of DR signals (WD16 - e.g. 642)) OASIS Issues Tracker 2010-11-20 21:15
00135 [OASIS Issue Tracker] Created: (ENERGYINTEROP-233) Figure 6 is arepeat of of figure 1. This is OK, the narrative reprise works with thetext. Figure 6 should probably be decorated with the VTN/VEN labels to showdevelopment, and not an error. OASIS Issues Tracker 2010-11-20 21:17
00136 [OASIS Issue Tracker] Created: (ENERGYINTEROP-234) Figures 7, 8need to lose the ERM and acquire a VTN...Verify service names in Figure 8 OASIS Issues Tracker 2010-11-20 21:17
00137 [OASIS Issue Tracker] Created: (ENERGYINTEROP-235) Changecardinality of EventInfo within EiEvent (WD16- 642) OASIS Issues Tracker 2010-11-20 21:51
00138 [OASIS Issue Tracker] Created: (ENERGYINTEROP-236) Requires Programcommunication services to match price communication services OASIS Issues Tracker 2010-11-20 21:55
00139 [OASIS Issue Tracker] Created: (ENERGYINTEROP-237) Incorporate useof emix price models into EiEvent (WD16 - 642, 709) OASIS Issues Tracker 2010-11-20 22:11
00140 [OASIS Issue Tracker] Created: (ENERGYINTEROP-238) There is notenough clarity in how ws calendar and emix are used within the context ofEI. OASIS Issues Tracker 2010-11-20 22:25
00141 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-188) General -Talking to CAISO - they understand the logic behind this. They are lookinginto providing level for the different situations, rather than or on top ofcomm price. OASIS Issues Tracker 2010-11-20 23:43
00142 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-185) General - Directreaction to Rish - understand toasters need HML, interact with those. Whatare the conformance rules for HML? If it's only kinda high or medium? OASIS Issues Tracker 2010-11-20 23:45
00143 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-184) General - WRTthe simplified L/M/H (Normal/Mod/High) has to be included - critical forcompatibility and ease of use of information. OASIS Issues Tracker 2010-11-20 23:45
00144 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-181) General - Don'tsee simple price levels -- can be an instance of the eventinfo type OASIS Issues Tracker 2010-11-20 23:45
00145 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-180) General - Simplelevels - not semantically coupled to anytyhing in the signals there OASIS Issues Tracker 2010-11-20 23:45
00146 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-179) 591 - Send allthree - price rel, current, and H/L/M?WTC OASIS Issues Tracker 2010-11-20 23:45
00147 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-177) 591 - Comment onl591 - dig deeper and understand what it means. If want to transmit aprice...simpler. An EiEvent never contains a price. Agree with M should beable to include other data items. No notion of the simple levels of pricefrom OpenADR. OASIS Issues Tracker 2010-11-20 23:47
00148 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-186) General - Evenat edge conformance group. Go to OpenADR. OASIS Issues Tracker 2010-11-20 23:49
00149 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-225) Promote venIDand vtnID to be attribute of EiEvent(WD16 - 647) OASIS Issues Tracker 2010-11-20 23:51
00150 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-211) Critical:Provide mechanism for dynamic pricing EventInfoTypeID (WD15, pg 642-644) OASIS Issues Tracker 2010-11-21 00:05
00151 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-214) Add amechanism for VEN to send status information to VTNs - a with request fromVTN (WD15, section 5): OASIS Issues Tracker 2010-11-21 00:11
00152 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-216) Critical:Provide a mechanism for load bidding information in EiEvent (WD15, 643-649) OASIS Issues Tracker 2010-11-21 00:15
00153 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-217) Create asupport service (WD 15, 16; section 7) OASIS Issues Tracker 2010-11-21 00:19
00154 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-227) Need moreexplicit definition of how wscal::Sequnce is used to describe the EiEventtime periods (WD16 - 642) OASIS Issues Tracker 2010-11-21 00:21
00155 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-229) Locationattributes within EiEvent are weak. (WD16 - 642) OASIS Issues Tracker 2010-11-21 00:23
00156 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-230) Figures 2, 3,and 4 are labeled ERM and Participant. They should be labels VTN and VEN OASIS Issues Tracker 2010-11-21 00:39
00157 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-230) Figures 2, 3,and 4 are labeled ERM and Participant. They should be labels VTN and VEN OASIS Issues Tracker 2010-11-21 00:41
00158 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-233) Figure 6 is arepeat of of figure 1. This is OK, the narrative reprise works with thetext. Figure 6 should probably be decorated with the VTN/VEN labels to showdevelopment, and not an error. OASIS Issues Tracker 2010-11-21 00:51
00159 [OASIS Issue Tracker] Created: (ENERGYINTEROP-239) We have to havesome better variant on Comformance when we release this guy for publicreview OASIS Issues Tracker 2010-11-21 01:05
00160 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-206) Line 323 andSection 5: EI DR DLC approaches not addressed elsewhere in the document OASIS Issues Tracker 2010-11-21 01:05
00161 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-194) Figures 2,3,4,7refer to ERM party. I do not see that term defined. OASIS Issues Tracker 2010-11-21 01:07
00162 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-218) line 460:"This work assumes that there is no direct interaction across the ESI."However there are assets on the other side of the ESI that have directinteration in eiEvent and eiConstraint. OASIS Issues Tracker 2010-11-21 01:09
00163 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-233) Figure 6 is arepeat of of figure 1. This is OK, the narrative reprise works with thetext. Figure 6 should probably be decorated with the VTN/VEN labels to showdevelopment, and not an error. OASIS Issues Tracker 2010-11-21 01:11
00164 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-209) Critical:Remove dependencies to WSCal via EMIX (WD15, ln 642-644, figure 9) OASIS Issues Tracker 2010-11-21 01:13
00165 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-227) Need moreexplicit definition of how wscal::Sequnce is used to describe the EiEventtime periods (WD16 - 642) OASIS Issues Tracker 2010-11-21 01:15
00166 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-94) 886 - Note inregard to performance expectations. Talks about performance parameters interms of seconds. Is this suitable within this document given that somenetworks are and have been deployed. OASIS Issues Tracker 2010-11-21 01:17
00167 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-98) 874 - My question- assuming conformance related to testing and cert - not clear what we'retrying to certify here? OASIS Issues Tracker 2010-11-21 01:17
00168 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-99) 874 - If there'sa testing and conformance process, could be referenced. OASIS Issues Tracker 2010-11-21 01:17
00169 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-101) 874 - Pile on.In conformance, reference the IETF document with SHALL, etc. Line 923 issomething you can't really test for conformance. OASIS Issues Tracker 2010-11-21 01:17
00170 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-190) General - Bigrequest for BAS - give us one standard, don't change it. OASIS Issues Tracker 2010-11-21 01:19
00171 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-188) General -Talking to CAISO - they understand the logic behind this. They are lookinginto providing level for the different situations, rather than or on top ofcomm price. OASIS Issues Tracker 2010-11-21 01:23
00172 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-192) General - Atoaster in CA that sheds 10MW using simple levels. Address the issue -different system integrators for different programs. OASIS Issues Tracker 2010-11-21 01:31
00173 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-190) General - Bigrequest for BAS - give us one standard, don't change it. OASIS Issues Tracker 2010-11-21 01:31
00174 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-167) 492, 500 - IfA is a Distributed Generation fac - will it reverse roles? When does it? Incorporate in new section 3 OASIS Issues Tracker 2010-11-21 01:35
00175 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-162) 435, 454-455 -Are buyers and seller defined before? The place you get tripped up arewords used every day. OASIS Issues Tracker 2010-11-21 01:49
00176 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-151) General - Inlanguage for EI Scope and in the dirgram, transmission and distributiondomains are ignored. Are we ignoring these from the rest 7 domains? Are wetotally ignoring those interactions and the rest of the SG? OASIS Issues Tracker 2010-11-21 01:57
00177 [OASIS Issue Tracker] Created: (ENERGYINTEROP-240) Section 6 uses"contract" while sections 5 and 7 use "agreement"; they should beconsistent and use "contract" OASIS Issues Tracker 2010-11-21 01:59
00178 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-240) Section 6 uses"contract" while sections 5 and 7 use "agreement"; they should beconsistent and use "contract" OASIS Issues Tracker 2010-11-21 01:59
00179 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-227) Need moreexplicit definition of how wscal::Sequnce is used to describe the EiEventtime periods (WD16 - 642) OASIS Issues Tracker 2010-11-21 02:21
00180 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-209) Critical:Remove dependencies to WSCal via EMIX (WD15, ln 642-644, figure 9) OASIS Issues Tracker 2010-11-21 04:35
00181 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-211) Critical:Provide mechanism for dynamic pricing EventInfoTypeID (WD15, pg 642-644) OASIS Issues Tracker 2010-11-21 04:39
00182 [OASIS Issue Tracker] Created: (ENERGYINTEROP-241) Clarify intentand semantics of SendQuote operation (WD15, ln. 624) OASIS Issues Tracker 2010-11-21 04:41
00183 [OASIS Issue Tracker] Created: (ENERGYINTEROP-242) Clarifyrelationship between EIFeedback Services and EIEvent Services (WD 15, ln653-655) OASIS Issues Tracker 2010-11-21 04:41
00184 [OASIS Issue Tracker] Created: (ENERGYINTEROP-243) Include someform of glossary or descriptive text for terms such as Asset (WD 15, fig.11 and 12) OASIS Issues Tracker 2010-11-21 04:43
00185 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-235) Changecardinality of EventInfo within EiEvent (WD16- 642) OASIS Issues Tracker 2010-11-21 14:33
00186 [OASIS Issue Tracker] Created: (ENERGYINTEROP-244) Line 717: ChangeVTN and VEN to Party in Table OASIS Issues Tracker 2010-11-21 14:59
00187 [OASIS Issue Tracker] Created: (ENERGYINTEROP-245) line 681: Whatdistinction is implied by the term partyEndPoint vs. Party URI? OASIS Issues Tracker 2010-11-21 15:21
00188 [OASIS Issue Tracker] Created: (ENERGYINTEROP-246) Sections 5,6,7 :The service definitions in 5,6,7 use "invoked by" and "service provider". Please define these terms as used here. OASIS Issues Tracker 2010-11-21 16:11
00189 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-161) 397 - Assumestimely automated metering? Also automated pricing information OASIS Issues Tracker 2010-11-22 00:37
00190 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-240) Section 6 uses"contract" while sections 5 and 7 use "agreement"; they should beconsistent and use "contract" OASIS Issues Tracker 2010-11-22 00:47
00191 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-237) Incorporate useof emix price models into EiEvent (WD16 - 642, 709) OASIS Issues Tracker 2010-11-22 00:51
00192 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-232) Need moredetailed specification of the interaction models, specifically around theacknowldgement of the reception of DR signals (WD16 - e.g. 642)) OASIS Issues Tracker 2010-11-22 00:53
00193 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-225) Promote venIDand vtnID to be attribute of EiEvent(WD16 - 647) OASIS Issues Tracker 2010-11-22 00:55
00194 [OASIS Issue Tracker] Issue Comment Edited: (ENERGYINTEROP-225)Promote venID and vtnID to be attribute of EiEvent(WD16 - 647) OASIS Issues Tracker 2010-11-22 00:57
00195 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-216) Critical:Provide a mechanism for load bidding information in EiEvent (WD15, 643-649) OASIS Issues Tracker 2010-11-22 01:01
00196 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-215) Remove 0-* asoptional requirements/services/elements as it creates interoperabilitychallenges (WD15, ln 643-649) OASIS Issues Tracker 2010-11-22 01:07
00197 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-214) Add a mechanismfor VEN to send status information to VTNs - a with request from VTN (WD15,section 5): OASIS Issues Tracker 2010-11-22 01:15
00198 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-205) Line 721:testEvent should be expanded from Boolean to allow for indication of othertypes of Events: Advanced (Normal), Immediate, Audit/Test. OASIS Issues Tracker 2010-11-22 01:31
00199 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-212) UML ClassDiagrams for EiEvent and Associated Classes, Operation Payloads (WD15, ln.643-649) OASIS Issues Tracker 2010-11-22 01:35
00200 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-211) Critical:Provide mechanism for dynamic pricing EventInfoTypeID (WD15, pg 642-644) OASIS Issues Tracker 2010-11-22 01:49
00201 [OASIS Issue Tracker] Issue Comment Edited: (ENERGYINTEROP-211)Critical: Provide mechanism for dynamic pricing EventInfoTypeID (WD15, pg642-644) OASIS Issues Tracker 2010-11-22 01:53
00202 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-211) Critical:Provide mechanism for dynamic pricing EventInfoTypeID (WD15, pg 642-644) OASIS Issues Tracker 2010-11-22 01:53
00203 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-78) 742 - Invokinga DR reliability event. But say "DR event" - does this mean it can't beused for anything else? Only reliability event? OASIS Issues Tracker 2010-11-22 01:53
00204 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-210) Critical: UMLClass Diagrams for EiEvent and Associated Classes, Operation Payloads(WD15, ln. 643-649) OASIS Issues Tracker 2010-11-22 01:57
00205 [OASIS Issue Tracker] Issue Comment Edited: (ENERGYINTEROP-212) UMLClass Diagrams for EiEvent and Associated Classes, Operation Payloads(WD15, ln. 643-649) OASIS Issues Tracker 2010-11-22 02:01
00206 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-226) Adddescriptions of UML attributes to the document OASIS Issues Tracker 2010-11-22 02:09
00207 [OASIS Issue Tracker] Issue Comment Edited: (ENERGYINTEROP-212) UMLClass Diagrams for EiEvent and Associated Classes, Operation Payloads(WD15, ln. 643-649) OASIS Issues Tracker 2010-11-22 02:11
00208 [OASIS Issue Tracker] Issue Comment Edited: (ENERGYINTEROP-212) UMLClass Diagrams for EiEvent and Associated Classes, Operation Payloads(WD15, ln. 643-649) OASIS Issues Tracker 2010-11-22 02:25
00209 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-210) Critical: UMLClass Diagrams for EiEvent and Associated Classes, Operation Payloads(WD15, ln. 643-649) OASIS Issues Tracker 2010-11-22 02:27
00210 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-209) Critical: Removedependencies to WSCal via EMIX (WD15, ln 642-644, figure 9) OASIS Issues Tracker 2010-11-22 02:29
00211 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-209) Critical:Remove dependencies to WSCal via EMIX (WD15, ln 642-644, figure 9) OASIS Issues Tracker 2010-11-22 02:31
00212 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-209) Critical: Removedependencies to WSCal via EMIX (WD15, ln 642-644, figure 9) OASIS Issues Tracker 2010-11-22 02:33
00213 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-208) Critical:Provide mechanism for events schedules inside of EiEvent Service (WD 15,ln. 627-644) OASIS Issues Tracker 2010-11-22 02:51
00214 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-83) 754 row 1 -Consistency across document. OASIS Issues Tracker 2010-11-22 03:05
00215 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-78) 742 - Invoking aDR reliability event. But say "DR event" - does this mean it can't be usedfor anything else? Only reliability event? OASIS Issues Tracker 2010-11-22 03:09
00216 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-94) 886 - Note inregard to performance expectations. Talks about performance parameters interms of seconds. Is this suitable within this document given that somenetworks are and have been deployed. OASIS Issues Tracker 2010-11-22 03:15
00217 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-167) 492, 500 - If Ais a Distributed Generation fac - will it reverse roles? When does it? Incorporate in new section 3 OASIS Issues Tracker 2010-11-22 03:35
00218 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-164) 469 - Defineterminology - define or refererence. OASIS Issues Tracker 2010-11-22 03:37
00219 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-183) General - Dynprice, not just real time prices. OASIS Issues Tracker 2010-11-22 03:55
00220 Night is late, but under 50 Jira comments left Toby Considine 2010-11-22 03:59
00221 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-197) Line 624. "aprice event is performed using a SendQuote operation" is followed by tablewith xxEvent operations. OASIS Issues Tracker 2010-11-22 04:03
00222 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-196) Lines 649, 624Figure 10 identifies EISend... and EISent payloads. There is no matchingservice in the table on line 624. OASIS Issues Tracker 2010-11-22 04:09
00223 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-165) 472, 477 -Typo - promissee should be promissor OASIS Issues Tracker 2010-11-22 04:57
00224 Re: [energyinterop] Night is late, but under 50 Jira comments left Hirish Hhatikar 2010-11-22 05:05
00225 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-232) Need moredetailed specification of the interaction models, specifically around theacknowldgement of the reception of DR signals (WD16 - e.g. 642)) OASIS Issues Tracker 2010-11-22 05:51
00226 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-225) Promote venIDand vtnID to be attribute of EiEvent(WD16 - 647) OASIS Issues Tracker 2010-11-22 05:55
00227 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-178) General - Going to have to have - BB argument -- a better undersanding of hosw thescheds/intervals are tied to the event info type. OASIS Issues Tracker 2010-11-22 06:19
00228 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-176) 588 - Go backto l588. Meat so far. Need more gap analysis. OASIS Issues Tracker 2010-11-22 06:27
00229 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-225) Promote venIDand vtnID to be attribute of EiEvent(WD16 - 647) OASIS Issues Tracker 2010-11-22 11:15
00230 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-246) Sections 5,6,7 :The service definitions in 5,6,7 use "invoked by" and "service provider". Please define these terms as used here. OASIS Issues Tracker 2010-11-22 15:37
00231 [OASIS Issue Tracker] Issue Comment Edited: (ENERGYINTEROP-237)Incorporate use of emix price models into EiEvent (WD16 - 642, 709) OASIS Issues Tracker 2010-11-22 15:37
00232 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-238) There is notenough clarity in how ws calendar and emix are used within the context ofEI. OASIS Issues Tracker 2010-11-22 15:43
00233 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-242) Clarifyrelationship between EIFeedback Services and EIEvent Services (WD 15, ln653-655) OASIS Issues Tracker 2010-11-22 15:43
00234 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-195) Lines 598, 604where is the interaction for DR Standing Bid defined? OASIS Issues Tracker 2010-11-22 15:45
00235 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-198) Line 655Feedback is provided by both Asset and Resource. Add Resource associationor ID reference. OASIS Issues Tracker 2010-11-22 15:45
00236 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-199) Line 685:Constraints are applicable to Both Asset and Resource. OASIS Issues Tracker 2010-11-22 15:45
00237 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-200) Line 689: Whereis the class / complex data type EIConstraintBehavior defined? OASIS Issues Tracker 2010-11-22 15:47
00238 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-201) Line 706: OptOutequivalent in IRC model includes: economic, emergency, must run, notparticipating, outage run status, override status, participating. OASIS Issues Tracker 2010-11-22 15:47
00239 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-202) Line 710 Figure16 - Opt out is applicable to both asset and resource. OASIS Issues Tracker 2010-11-22 15:47
00240 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-203) Line 718 Section7.3.1 - Feedback vs. Status OASIS Issues Tracker 2010-11-22 15:51
00241 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-206) Line 323 andSection 5: EI DR DLC approaches not addressed elsewhere in the document OASIS Issues Tracker 2010-11-22 15:51
00242 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-207) Critical:Include simple client information in EiEvent Service text and figure 9(WD15, ln. 619-644, figure 9) OASIS Issues Tracker 2010-11-22 15:51
00243 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-207) Critical:Include simple client information in EiEvent Service text and figure 9(WD15, ln. 619-644, figure 9) OASIS Issues Tracker 2010-11-22 15:55
00244 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-213) Include non-normreference for resource definition (EI/ EMIX) OASIS Issues Tracker 2010-11-22 15:57
00245 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-217) Create a supportservice (WD 15, 16; section 7) OASIS Issues Tracker 2010-11-22 15:57
00246 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-218) line 460: "Thiswork assumes that there is no direct interaction across the ESI." Howeverthere are assets on the other side of the ESI that have direct interationin eiEvent and eiConstraint. OASIS Issues Tracker 2010-11-22 15:59
00247 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-219) Line 402 : "callfor performance" need further clarification OASIS Issues Tracker 2010-11-22 15:59
00248 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-220) line 517:Structure of Interactions is different for Transactive Services and VTN/VENServices OASIS Issues Tracker 2010-11-22 15:59
00249 Re: [energyinterop] Night is late, but under 50 Jira comments left William Cox 2010-11-22 16:25
00250 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-169) 610 - Lookingat relationship of events for the deployment level. OASIS Issues Tracker 2010-11-22 16:47
00251 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-225) Promote venIDand vtnID to be attribute of EiEvent(WD16 - 647) OASIS Issues Tracker 2010-11-22 17:13
00252 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-225) Promote venIDand vtnID to be attribute of EiEvent(WD16 - 647) OASIS Issues Tracker 2010-11-22 18:07
00253 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-204) Line 721Status is applicable to both asset and resource. OASIS Issues Tracker 2010-11-22 18:15
00254 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-169) 610 - Lookingat relationship of events for the deployment level. OASIS Issues Tracker 2010-11-22 18:19
00255 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-201) Line 706:OptOut equivalent in IRC model includes: economic, emergency, must run, notparticipating, outage run status, override status, participating. OASIS Issues Tracker 2010-11-22 18:31
00256 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-215) Remove 0-* asoptional requirements/services/elements as it creates interoperabilitychallenges (WD15, ln 643-649) OASIS Issues Tracker 2010-11-22 18:35
00257 RE: [energyinterop] [OASIS Issue Tracker] Commented: (ENERGYINTEROP-201) Line 706: OptOut equivalent in IRC model includes: economic, emergency, must run, not participating, outage run status, override status, participating. Bruce Bartell 2010-11-22 18:43
00258 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-214) Add amechanism for VEN to send status information to VTNs - a with request fromVTN (WD15, section 5): OASIS Issues Tracker 2010-11-22 18:49
00259 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-213) Includenon-norm reference for resource definition (EI/ EMIX) OASIS Issues Tracker 2010-11-22 18:51
00260 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-212) UML ClassDiagrams for EiEvent and Associated Classes, Operation Payloads (WD15, ln.643-649) OASIS Issues Tracker 2010-11-22 18:55
00261 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-207) Critical:Include simple client information in EiEvent Service text and figure 9(WD15, ln. 619-644, figure 9) OASIS Issues Tracker 2010-11-22 18:55
00262 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-211) Critical:Provide mechanism for dynamic pricing EventInfoTypeID (WD15, pg 642-644) OASIS Issues Tracker 2010-11-22 19:03
00263 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-212) UML ClassDiagrams for EiEvent and Associated Classes, Operation Payloads (WD15, ln.643-649) OASIS Issues Tracker 2010-11-22 19:11
00264 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-210) Critical: UMLClass Diagrams for EiEvent and Associated Classes, Operation Payloads(WD15, ln. 643-649) OASIS Issues Tracker 2010-11-22 19:11
00265 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-208) Critical:Provide mechanism for events schedules inside of EiEvent Service (WD 15,ln. 627-644) OASIS Issues Tracker 2010-11-22 19:13
00266 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-223) line 697 andline 702 (table): There is no operation to delete a quote yet the tablehas EIDeleteQuote OASIS Issues Tracker 2010-11-22 19:15
00267 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-207) Critical:Include simple client information in EiEvent Service text and figure 9(WD15, ln. 619-644, figure 9) OASIS Issues Tracker 2010-11-22 19:17
00268 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-221) line 611 andChapter 6 : move event services and chapter 5 to follow TransactiveServices OASIS Issues Tracker 2010-11-22 19:19
00269 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-218) line 460:"This work assumes that there is no direct interaction across the ESI."However there are assets on the other side of the ESI that have directinteration in eiEvent and eiConstraint. OASIS Issues Tracker 2010-11-22 19:21
00270 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-217) Create asupport service (WD 15, 16; section 7) OASIS Issues Tracker 2010-11-22 19:23
00271 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-208) Critical:Provide mechanism for events schedules inside of EiEvent Service (WD 15,ln. 627-644) OASIS Issues Tracker 2010-11-22 19:23
00272 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-198) Line 655Feedback is provided by both Asset and Resource. Add Resource associationor ID reference. OASIS Issues Tracker 2010-11-22 19:25
00273 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-214) Add amechanism for VEN to send status information to VTNs - a with request fromVTN (WD15, section 5): OASIS Issues Tracker 2010-11-22 19:27
00274 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-208) Critical:Provide mechanism for events schedules inside of EiEvent Service (WD 15,ln. 627-644) OASIS Issues Tracker 2010-11-22 19:29
00275 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-208) Critical:Provide mechanism for events schedules inside of EiEvent Service (WD 15,ln. 627-644) OASIS Issues Tracker 2010-11-22 19:29
00276 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-235) Changecardinality of EventInfo within EiEvent (WD16- 642) OASIS Issues Tracker 2010-11-22 19:29
00277 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-245) line 681: Whatdistinction is implied by the term partyEndPoint vs. Party URI? OASIS Issues Tracker 2010-11-22 19:29
00278 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-241) Clarify intentand semantics of SendQuote operation (WD15, ln. 624) OASIS Issues Tracker 2010-11-22 19:33
00279 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-241) Clarify intentand semantics of SendQuote operation (WD15, ln. 624) OASIS Issues Tracker 2010-11-22 19:37
00280 [OASIS Issue Tracker] Created: (ENERGYINTEROP-247) (line 825)...theDRAS is retail specific, not wholesale. Does conformance imply that a DRASis required for compliance with the spec? OASIS Issues Tracker 2010-11-22 19:39
00281 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-245) line 681: Whatdistinction is implied by the term partyEndPoint vs. Party URI? OASIS Issues Tracker 2010-11-22 19:43
00282 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-247) (line825)...the DRAS is retail specific, not wholesale. Does conformance implythat a DRAS is required for compliance with the spec? OASIS Issues Tracker 2010-11-22 19:43
00283 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-205) Line 721:testEvent should be expanded from Boolean to allow for indication of othertypes of Events: Advanced (Normal), Immediate, Audit/Test. OASIS Issues Tracker 2010-11-22 19:43
00284 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-210) Critical: UMLClass Diagrams for EiEvent and Associated Classes, Operation Payloads(WD15, ln. 643-649) OASIS Issues Tracker 2010-11-22 19:57
00285 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-207) Critical:Include simple client information in EiEvent Service text and figure 9(WD15, ln. 619-644, figure 9) OASIS Issues Tracker 2010-11-22 19:57
00286 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-226) Add descriptionsof UML attributes to the document OASIS Issues Tracker 2010-11-22 20:05
00287 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-207) Critical:Include simple client information in EiEvent Service text and figure 9(WD15, ln. 619-644, figure 9) OASIS Issues Tracker 2010-11-22 20:13
00288 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-238) There is notenough clarity in how ws calendar and emix are used within the context ofEI. OASIS Issues Tracker 2010-11-22 20:13
00289 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-202) Line 710Figure 16 - Opt out is applicable to both asset and resource. OASIS Issues Tracker 2010-11-22 20:47
00290 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-201) Line 706:OptOut equivalent in IRC model includes: economic, emergency, must run, notparticipating, outage run status, override status, participating. OASIS Issues Tracker 2010-11-22 20:51
00291 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-238) There is notenough clarity in how ws calendar and emix are used within the context ofEI. OASIS Issues Tracker 2010-11-22 20:57
00292 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-201) Line 706:OptOut equivalent in IRC model includes: economic, emergency, must run, notparticipating, outage run status, override status, participating. OASIS Issues Tracker 2010-11-22 21:29
00293 [OASIS Issue Tracker] Issue Comment Edited: (ENERGYINTEROP-201)Line 706: OptOut equivalent in IRC model includes: economic, emergency,must run, not participating, outage run status, override status,participating. OASIS Issues Tracker 2010-11-22 21:31
00294 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-201) Line 706:OptOut equivalent in IRC model includes: economic, emergency, must run, notparticipating, outage run status, override status, participating. OASIS Issues Tracker 2010-11-22 21:33
00295 RE: [energyinterop] [OASIS Issue Tracker] Commented: (ENERGYINTEROP-201) Line 706: OptOut equivalent in IRC model includes: economic, emergency, must run, not participating, outage run status, override status, participating. Bruce Bartell 2010-11-22 21:36
00296 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-201) Line 706:OptOut equivalent in IRC model includes: economic, emergency, must run, notparticipating, outage run status, override status, participating. OASIS Issues Tracker 2010-11-22 21:45
00297 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-201) Line 706:OptOut equivalent in IRC model includes: economic, emergency, must run, notparticipating, outage run status, override status, participating. OASIS Issues Tracker 2010-11-22 21:47
00298 RE: [energyinterop] [OASIS Issue Tracker] Commented:(ENERGYINTEROP-201) Line 706: OptOut equivalent in IRC model includes:economic, emergency, must run, not participating, outage run status,override status, participating. "Donsidine, Soby (Dampus Rervices JS)" 2010-11-22 21:50
00299 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-231) Need alocation for the permanent location of the EPRI/Horst paper OASIS Issues Tracker 2010-11-22 22:29
00300 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-235) Changecardinality of EventInfo within EiEvent (WD16- 642) OASIS Issues Tracker 2010-11-22 23:17
00301 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-246) Sections 5,6,7 :The service definitions in 5,6,7 use "invoked by" and "service provider". Please define these terms as used here. OASIS Issues Tracker 2010-11-22 23:19
00302 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-228) Line 618: Needto be clear that events can be raised for any valid reason agreed to by theparties to a transaction. OASIS Issues Tracker 2010-11-23 03:57
00303 [OASIS Issue Tracker] Created: (ENERGYINTEROP-248) Asset andResource need to be defined early in the document OASIS Issues Tracker 2010-11-23 04:05
00304 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-199) Line 685:Constraints are applicable to Both Asset and Resource. OASIS Issues Tracker 2010-11-23 04:07
00305 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-198) Line 655Feedback is provided by both Asset and Resource. Add Resource associationor ID reference. OASIS Issues Tracker 2010-11-23 04:09
00306 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-225) Promote venIDand vtnID to be attribute of EiEvent(WD16 - 647) OASIS Issues Tracker 2010-11-23 04:11
00307 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-202) Line 710 Figure16 - Opt out is applicable to both asset and resource. OASIS Issues Tracker 2010-11-23 04:17
00308 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-200) Line 689: Whereis the class / complex data type EIConstraintBehavior defined? OASIS Issues Tracker 2010-11-23 04:23
00309 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-227) Need moreexplicit definition of how wscal::Sequnce is used to describe the EiEventtime periods (WD16 - 642) OASIS Issues Tracker 2010-11-23 04:33
00310 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-226) Add descriptionsof UML attributes to the document OASIS Issues Tracker 2010-11-23 04:35
00311 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-227) Need moreexplicit definition of how wscal::Sequnce is used to describe the EiEventtime periods (WD16 - 642) OASIS Issues Tracker 2010-11-23 04:39
00312 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-238) There is notenough clarity in how ws calendar and emix are used within the context ofEI. OASIS Issues Tracker 2010-11-23 04:39
00313 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-195) Lines 598, 604where is the interaction for DR Standing Bid defined? OASIS Issues Tracker 2010-11-23 04:41
00314 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-232) Need moredetailed specification of the interaction models, specifically around theacknowldgement of the reception of DR signals (WD16 - e.g. 642)) OASIS Issues Tracker 2010-11-23 04:43
00315 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-236) Requires Programcommunication services to match price communication services OASIS Issues Tracker 2010-11-23 04:45
00316 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-232) Need moredetailed specification of the interaction models, specifically around theacknowldgement of the reception of DR signals (WD16 - e.g. 642)) OASIS Issues Tracker 2010-11-23 05:17
00317 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-108) Indication ofhow firm a quote is OASIS Issues Tracker 2010-11-23 05:25
00318 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-192) General - Atoaster in CA that sheds 10MW using simple levels. Address the issue -different system integrators for different programs. OASIS Issues Tracker 2010-11-23 05:25
00319 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-177) 591 - Comment onl591 - dig deeper and understand what it means. If want to transmit aprice...simpler. An EiEvent never contains a price. Agree with M should beable to include other data items. No notion of the simple levels of pricefrom OpenADR. OASIS Issues Tracker 2010-11-23 05:25
00320 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-181) General - Don'tsee simple price levels -- can be an instance of the eventinfo type OASIS Issues Tracker 2010-11-23 05:25
00321 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-185) General - Directreaction to Rish - understand toasters need HML, interact with those. Whatare the conformance rules for HML? If it's only kinda high or medium? OASIS Issues Tracker 2010-11-23 05:26
00322 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-180) General - Simplelevels - not semantically coupled to anytyhing in the signals there OASIS Issues Tracker 2010-11-23 05:26
00323 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-184) General - WRTthe simplified L/M/H (Normal/Mod/High) has to be included - critical forcompatibility and ease of use of information. OASIS Issues Tracker 2010-11-23 05:26
00324 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-186) General - Evenat edge conformance group. Go to OpenADR. OASIS Issues Tracker 2010-11-23 05:26
00325 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-190) General - Bigrequest for BAS - give us one standard, don't change it. OASIS Issues Tracker 2010-11-23 05:26
00326 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-237) Incorporate useof emix price models into EiEvent (WD16 - 642, 709) OASIS Issues Tracker 2010-11-23 05:26
00327 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-217) Create a supportservice (WD 15, 16; section 7) OASIS Issues Tracker 2010-11-23 05:32
00328 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-179) 591 - Send allthree - price rel, current, and H/L/M?WTC OASIS Issues Tracker 2010-11-23 05:35
00329 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-229) Locationattributes within EiEvent are weak. (WD16 - 642) OASIS Issues Tracker 2010-11-23 05:45
00330 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-108) Indication ofhow firm a quote is OASIS Issues Tracker 2010-11-23 05:47
00331 [OASIS Issue Tracker] Created: (ENERGYINTEROP-249) Each Ack Stringand Optout reason string may need to have a defined list OASIS Issues Tracker 2010-11-23 05:59
00332 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-215) Remove 0-* asoptional requirements/services/elements as it creates interoperabilitychallenges (WD15, ln 643-649) OASIS Issues Tracker 2010-11-23 06:07
00333 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-210) Critical: UMLClass Diagrams for EiEvent and Associated Classes, Operation Payloads(WD15, ln. 643-649) OASIS Issues Tracker 2010-11-23 06:23
00334 [OASIS Issue Tracker] Created: (ENERGYINTEROP-250) schemaVersionshould be added to all schemas OASIS Issues Tracker 2010-11-23 06:25
00335 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-212) UML ClassDiagrams for EiEvent and Associated Classes, Operation Payloads (WD15, ln.643-649) OASIS Issues Tracker 2010-11-23 06:27
00336 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-180) General -Simple levels - not semantically coupled to anytyhing in the signals there OASIS Issues Tracker 2010-11-23 06:27
00337 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-246) Sections 5,6,7 :The service definitions in 5,6,7 use "invoked by" and "service provider". Please define these terms as used here. OASIS Issues Tracker 2010-11-23 06:47
00338 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-242) Clarifyrelationship between EIFeedback Services and EIEvent Services (WD 15, ln653-655) OASIS Issues Tracker 2010-11-23 07:01
00339 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-231) Need a locationfor the permanent location of the EPRI/Horst paper OASIS Issues Tracker 2010-11-23 07:03
00340 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-250) schemaVersionshould be added to all schemas OASIS Issues Tracker 2010-11-23 07:07
00341 [OASIS Issue Tracker] Created: (ENERGYINTEROP-251) EiEvent usesEiClass "Location" but should use CIM InterfacePricingPoint OASIS Issues Tracker 2010-11-23 07:13
00342 [OASIS Issue Tracker] Created: (ENERGYINTEROP-252) EMIX support fora "contract" flag should be verified if needed. OASIS Issues Tracker 2010-11-23 11:31
00343 [OASIS Issue Tracker] Created: (ENERGYINTEROP-253) Program CallServices section is missing from document OASIS Issues Tracker 2010-11-23 11:47
00344 WD17 Documents uploading Toby Considine 2010-11-23 12:06
00345 Groups - energyinterop-1 0-spec-wd-17 with changes.docx uploaded [email protected] 2010-11-23 12:10
00346 Groups - energyinterop-1 0-spec-wd-17.docx uploaded [email protected] 2010-11-23 12:15
00347 Groups - energyinterop-1 0-spec-wd-17.pdf uploaded [email protected] 2010-11-23 12:25
00348 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-217) Create asupport service (WD 15, 16; section 7) OASIS Issues Tracker 2010-11-23 15:21
00349 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-251) EiEvent usesEiClass "Location" but should use CIM InterfacePricingPoint OASIS Issues Tracker 2010-11-23 15:51
00350 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-214) Add a mechanismfor VEN to send status information to VTNs - a with request from VTN (WD15,section 5): OASIS Issues Tracker 2010-11-23 15:51
00351 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-210) Critical: UMLClass Diagrams for EiEvent and Associated Classes, Operation Payloads(WD15, ln. 643-649) OASIS Issues Tracker 2010-11-23 15:51
00352 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-205) Line 721:testEvent should be expanded from Boolean to allow for indication of othertypes of Events: Advanced (Normal), Immediate, Audit/Test. OASIS Issues Tracker 2010-11-23 15:51
00353 [OASIS Issue Tracker] Created: (ENERGYINTEROP-254) Need to add nameattribute to EventType (WD17 - 922) OASIS Issues Tracker 2010-11-23 16:41
00354 Pricing and EMIX in EI Considine, Toby (Campus Services IT) 2010-11-23 17:01
00355 Groups - energyinterop-1 0-spec-wd-17.1.pdf uploaded [email protected] 2010-11-23 18:53
00356 [OASIS Issue Tracker] Created: (ENERGYINTEROP-255) Line 335 : addlink to TeMIX White Paper OASIS Issues Tracker 2010-11-23 19:17
00357 RE: [energyinterop] [OASIS Issue Tracker] Updated: (ENERGYINTEROP-205) Line 721: testEvent should be expanded from Boolean to allow for indication of other types of Events: Advanced (Normal), Immediate, Audit/Test. Bruce Bartell 2010-11-23 19:27
00358 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-206) Line 323 andSection 5: EI DR DLC approaches not addressed elsewhere in the document OASIS Issues Tracker 2010-11-23 19:45
00359 RE: [energyinterop] [OASIS Issue Tracker] Updated:(ENERGYINTEROP-205) Line 721: testEvent should be expanded from Boolean toallow for indication of other types of Events: Advanced (Normal), Immediate,Audit/Test. "Donsidine, Soby (Dampus Rervices JS)" 2010-11-23 19:49
00360 RE: [energyinterop] [OASIS Issue Tracker] Commented: (ENERGYINTEROP-206) Line 323 and Section 5: EI DR DLC approaches not addressed elsewhere in the document Toby Considine 2010-11-23 20:19
00361 [OASIS Issue Tracker] Created: (ENERGYINTEROP-256) Section 3 :Inconsistency in defintions of Actors and Roles. OASIS Issues Tracker 2010-11-23 20:25
00362 RE: [energyinterop] [OASIS Issue Tracker] Commented: (ENERGYINTEROP-206) Line 323 and Section 5: EI DR DLC approaches not addressed elsewhere in the document Bruce Bartell 2010-11-23 20:25
00363 [OASIS Issue Tracker] Created: (ENERGYINTEROP-257) 586 Section 3.2applies only to DR and Resource Distpatch Interactions and not toTransactive Interactions OASIS Issues Tracker 2010-11-23 20:43
00364 [OASIS Issue Tracker] Created: (ENERGYINTEROP-258) 643: Figure 3-7and discussion duplicates Figure 3-1 and discussion and leads toconfusion.confusion OASIS Issues Tracker 2010-11-23 20:47
00365 [OASIS Issue Tracker] Created: (ENERGYINTEROP-259) line 459 to 464:Suggested clarifications of market activities. OASIS Issues Tracker 2010-11-23 21:09
00366 Items to Consider Regarding Deliverables to SGIP for PAP09 Bruce Bartell 2010-11-23 22:40
00367 [OASIS Issue Tracker] Created: (ENERGYINTEROP-260) Section 5:Energy Interoperation Services: Suggest edits to first three paragraphs toprovide balance to Demand Response and Transactive Services overview. OASIS Issues Tracker 2010-11-24 01:29
00368 [OASIS Issue Tracker] Created: (ENERGYINTEROP-261) line 797 : Proposed minor clarifications as to roles and relationship of Transactiveto VTNs and VENs. OASIS Issues Tracker 2010-11-24 01:39
00369 [OASIS Issue Tracker] Created: (ENERGYINTEROP-262) line 851: Table6-4 Service Consumer and Provider should be Party OASIS Issues Tracker 2010-11-24 02:05
00370 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-260) Section 5:Energy Interoperation Services: Suggest edits to first three paragraphs toprovide balance to Demand Response and Transactive Services overview. OASIS Issues Tracker 2010-11-24 02:43
00371 Groups - Energy Interoperation TC Weekly Teleconference modified [email protected] 2010-11-24 05:34
00372 [OASIS Issue Tracker] Created: (ENERGYINTEROP-263) Additional typesneeded in EventInfoType plus name and association changes OASIS Issues Tracker 2010-11-24 05:51
00373 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-206) Line 323 andSection 5: EI DR DLC approaches not addressed elsewhere in the document OASIS Issues Tracker 2010-11-24 12:59
00374 [OASIS Issue Tracker] Created: (ENERGYINTEROP-264) update line 897per issue 263 OASIS Issues Tracker 2010-11-24 13:05
00375 [OASIS Issue Tracker] Created: (ENERGYINTEROP-265) removeRequestTransactions OASIS Issues Tracker 2010-11-24 13:37
00376 [OASIS Issue Tracker] Created: (ENERGYINTEROP-266) address security OASIS Issues Tracker 2010-11-24 14:15
00377 Groups - Attempt to explain use of Interval Communications (EI message Doodles..pdf) uploaded [email protected] 2010-11-24 14:30
00378 [OASIS Issue Tracker] Created: (ENERGYINTEROP-267) Redo Section 9Conformance OASIS Issues Tracker 2010-11-24 14:37
00379 [OASIS Issue Tracker] Created: (ENERGYINTEROP-268) Improve andSimplify description of WS-Calendar as a building block for EI OASIS Issues Tracker 2010-11-24 14:39
00380 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-267) Redo Section 9Conformance OASIS Issues Tracker 2010-11-24 14:47
00381 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-266) addresssecurity OASIS Issues Tracker 2010-11-24 14:51
00382 [OASIS Issue Tracker] Created: (ENERGYINTEROP-269) Discussion ofBundling or message optimization or ... OASIS Issues Tracker 2010-11-24 14:55
00383 [OASIS Issue Tracker] Created: (ENERGYINTEROP-270) Appendixwrite-up suggestions OASIS Issues Tracker 2010-11-24 15:01
00384 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-266) addresssecurity OASIS Issues Tracker 2010-11-24 15:01
00385 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-241) Clarify intentand semantics of SendQuote operation (WD15, ln. 624) OASIS Issues Tracker 2010-11-24 15:05
00386 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-267) Redo Section 9Conformance OASIS Issues Tracker 2010-11-24 15:09
00387 [OASIS Issue Tracker] Created: (ENERGYINTEROP-271) Missing updatednon-normative references to the IRC and updated acknoledgements OASIS Issues Tracker 2010-11-24 15:13
00388 [OASIS Issue Tracker] Created: (ENERGYINTEROP-272) level indicationfor "wind blowing" OASIS Issues Tracker 2010-11-24 15:15
00389 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-254) Need to addname attribute to EventType (WD17 - 922) OASIS Issues Tracker 2010-11-24 15:15
00390 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-270) Appendixwrite-up suggestions OASIS Issues Tracker 2010-11-24 15:17
00391 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-270) Appendixwrite-up suggestions OASIS Issues Tracker 2010-11-24 15:21
00392 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-270) Appendixwrite-up suggestions OASIS Issues Tracker 2010-11-24 15:41
00393 Groups - Mapping_IRC-to-EITC_Interactions_20101124.docx uploaded [email protected] 2010-11-24 15:56
00394 [OASIS Issue Tracker] Created: (ENERGYINTEROP-273) General - Notable to map all the IRC interactions to the current spec OASIS Issues Tracker 2010-11-24 15:57
00395 [OASIS Issue Tracker] Updated: (ENERGYINTEROP-265) removeRequestTransactions OASIS Issues Tracker 2010-11-24 17:39
00396 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-268) Improve andSimplify description of WS-Calendar as a building block for EI OASIS Issues Tracker 2010-11-24 17:49
00397 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-262) line 851:Table 6-4 Service Consumer and Provider should be Party OASIS Issues Tracker 2010-11-24 17:51
00398 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-270) Appendixwrite-up suggestions OASIS Issues Tracker 2010-11-26 03:19
00399 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-267) Redo Section 9Conformance OASIS Issues Tracker 2010-11-26 03:25
00400 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-260) Section 5:Energy Interoperation Services: Suggest edits to first three paragraphs toprovide balance to Demand Response and Transactive Services overview. OASIS Issues Tracker 2010-11-26 03:35
00401 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-217) Create asupport service (WD 15, 16; section 7) OASIS Issues Tracker 2010-11-26 03:39
00402 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-250) schemaVersionshould be added to all schemas OASIS Issues Tracker 2010-11-26 03:41
00403 [OASIS Issue Tracker] Commented: (ENERGYINTEROP-180) General -Simple levels - not semantically coupled to anytyhing in the signals there OASIS Issues Tracker 2010-11-26 03:43
00404 Groups - energyinterop-1-0-spec-wd-18.pdf uploaded [email protected] 2010-11-26 17:43
00405 Groups - EnergyInterop Meeting Notes Draft 20101124.docx uploaded [email protected] 2010-11-26 19:51
00406 Groups - EnergyInterop Minutes 20101123 (EnergyInterop Minutes 20101123.doc) uploaded [email protected] 2010-11-26 20:30
00407 Groups - EnergyInterop Minutes 20101123 (EnergyInterop Minutes 20101123.doc) modified [email protected] 2010-11-26 20:31
00408 Groups - energyinterop-1-0-spec-wd-18corrected.docx uploaded [email protected] 2010-11-26 20:42
00409 Groups - energyinterop-1-0-spec-cd-01.docx uploaded [email protected] 2010-11-26 20:46
00410 Groups - energyinterop-1-0-spec-cd-01.pdf uploaded [email protected] 2010-11-26 20:49
00411 Groups - energyinterop-1-0-spec-cd-01.zip uploaded [email protected] 2010-11-26 20:56
00412 Groups - energyinterop-1-0-spec-wd-18corrected.docx uploaded [email protected] 2010-11-26 21:09
00413 Groups - energyinterop-1-0-spec-cd-01.zip uploaded [email protected] 2010-11-26 21:19
00414 30-day Committee Specification Draft Review Request for Energy Interoperation Committee V1.0 [email protected] 2010-11-26 21:37
00415 Groups - energyinterop-1-0-spec-cd-01.docx uploaded [email protected] 2010-11-26 21:41
00416 Groups - energyinterop-1-0-spec-cd-01.pdf uploaded [email protected] 2010-11-26 21:55
00417 Public Review of Energy Interoperation Version 1.0 Mary McRae 2010-11-27 17:40
00418 Changes between PR and CD as submittedq Toby Considine 2010-11-28 12:25
00419 Groups - TeMIX Grid Interop 2010 Paper by Cazalet (GI10-Paper -Cazalet.pdf) uploaded [email protected] 2010-11-28 22:02
00420 Re: [energyinterop] Changes between PR and CD as submittedq [ary [cQae 2010-11-29 03:53
00421 RE: [energyinterop] Changes between PR and CD as submittedq Considine, Toby (Campus Services IT) 2010-11-29 11:15
00422 Re: [energyinterop] Changes between PR and CD as submittedq [ary [cQae 2010-11-29 14:22
00423 Groups - Energy Interoperation Version 1.0 CSPRD01 (docs.oasis-open.org/energyinterop/ei/v1.0/csprd01/energyinterop-v1.0-csprd01.html) uploaded [email protected] 2010-11-29 17:51
00424 Groups - Energy Interoperation Version 1.0 CSD01 (docs.oasis-open.org/energyinterop/ei/v1.0/csd01/energyinterop-v1.0-csd01.html) uploaded [email protected] 2010-11-29 17:51
00425 Re: Working Draft Template Mary McRae 2010-11-29 18:53